Wastewater plants in Brazil

2,820 plants indexed. Showing 2,197 matching current filters.

2,197 plants matching filters

ETE NOSSA SENHORA APARECIDA

Rio Negro, Paraná

ETE Nossa Senhora Aparecida is a secondary wastewater treatment plant in Rio Negro, Paraná, Brazil, serving approximately 13,551 people. It discharges treated effluent into local water bodies, supporting downstream ecosystems.

Secondary 13,551 Low

ETE QUITANDINHA PR

Quitandinha, Paraná

ETE Quitandinha PR is a secondary treatment plant serving 818 people in Quitandinha, Paraná, Brazil. It discharges 172.80 cubic meters of treated wastewater daily.

Secondary 818 Low

ETE BONITO QUATIGUA

Quatiguá, Paraná

ETE Bonito Quatigua is a secondary wastewater treatment plant serving Quatiguá, Paraná, Brazil. It treats wastewater from a population of 1,780 with a discharge volume of 259.20 cubic meters.

Secondary 1,780 Low

ETE VILA CONCEICAO

Porto Amazonas, Paraná

ETE VILA CONCEICAO is a secondary wastewater treatment plant in Porto Amazonas, Paraná, Brazil, serving 312 people with a discharge volume of 86.40 m³/day.

Secondary 312 Low

ETE AREIAL

Porto Amazonas, Paraná

ETE AREIAL is a secondary wastewater treatment plant serving Porto Amazonas, Paraná, Brazil. It discharges approximately 589 m³/day of treated effluent, supporting local sanitation infrastructure.

Secondary 2,126 Low

ETE BARCELONA MANDIRITUBA

Mandirituba, Paraná

ETE Barcelona Mandirituba is a secondary wastewater treatment plant serving Mandirituba, Paraná, Brazil. It discharges approximately 62.21 cubic meters of treated effluent daily.

Secondary 350 Low

ETE BUQUEIRINHO

Itaperuçu, Paraná

ETE BUQUEIRINHO is a secondary treatment plant in Itaperuçu, Paraná, Brazil, serving approximately 3,377 people. It discharges treated wastewater into local water bodies, supporting downstream ecosystems.

Secondary 3,377 Low

ETE SANTA CANDIDA

Colombo, Paraná

ETE Santa Candida is a secondary treatment plant serving 446 people in Colombo, Paraná, Brazil. It discharges 77.08 m³/day of treated wastewater into local water bodies.

Secondary 446 Low

ETE CONTENDA

Araucária, Paraná

ETE CONTENDA is a secondary wastewater treatment plant in Araucária, Paraná, Brazil, serving approximately 6,444 people. It discharges treated effluent into local water bodies within the Iguaçu River basin.

Secondary 6,444 Low

ETE MARAMBAIA

Colombo, Paraná

ETE Marambaia is a secondary treatment plant serving Colombo, Paraná, Brazil. It treats wastewater for approximately 63,833 people with a discharge volume of 730.64 units.

Secondary 63,833 Low

ETE COLOMBO SEDE

Colombo, Paraná

ETE Colombo Sede is a secondary wastewater treatment plant serving Colombo, Paraná, Brazil. It treats municipal wastewater for approximately 35,855 people with a discharge volume of 410.40 (unit unspecified).

Secondary 35,855 Low

ETE VILA ELIANE

Cerro Azul, Paraná

ETE VILA ELIANE is a secondary wastewater treatment plant in Cerro Azul, Paraná, Brazil. It serves a small population of 102 and discharges 12.96 cubic meters of treated wastewater.

Secondary 102 Low

ETE POLO I

Carambeí, Paraná

ETE POLO I is a secondary treatment plant serving Carambeí, Paraná, Brazil. It treats wastewater for approximately 3,950 people with a discharge volume of 400.90 (unit unspecified).

Secondary 3,950 Low

ETE SANTA QUITeRIA CURITIBA

Curitiba, Paraná

ETE Santa Quitéria is an advanced wastewater treatment plant in Curitiba, Paraná, Brazil, serving approximately 6,627 people with a discharge volume of 399.02 units.

Advanced 6,627 Low

ETE ITAQUI CAMPO LARGO

Campo Largo, Paraná

ETE Itaqui Campo Largo is a secondary treatment plant serving 5,310 people in Campo Largo, Paraná, Brazil. It discharges 505.51 cubic meters of treated wastewater daily.

Secondary 5,310 Low

ETE ENGENHO CAMPINA GRANDE DO SUL

Campina Grande do Sul, Paraná

ETE Engenho Campina Grande do Sul is a secondary treatment plant serving 27,307 people in Campina Grande do Sul, Paraná, Brazil. It discharges 345.60 cubic meters of treated wastewater daily.

Secondary 27,307 Low

ETE TAPERA

Bocaiúva do Sul, Paraná

ETE TAPERA is a secondary treatment plant serving Bocaiúva do Sul, Paraná, Brazil. It treats wastewater for approximately 5,520 residents with a discharge volume of 477.81 cubic meters.

Secondary 5,520 Low

ETE BALSA NOVA

Lapa, Paraná

ETE Balsa Nova is a secondary wastewater treatment plant serving 1,471 people in Lapa, Paraná, Brazil. It discharges 286.85 m³/day of treated effluent into local waterways.

Secondary 1,471 Low

ETE AGUDOS DO SUL

Agudos do Sul, Paraná

ETE AGUDOS DO SUL is a secondary treatment plant serving Agudos do Sul, Paraná, Brazil. It treats wastewater for a population of 913 with a discharge volume of 172.80 m³/day.

Secondary 913 Low

ETE VARZELANDIA_SEDE

Varzelândia, Minas Gerais

ETE Varzelandia Sede is a secondary wastewater treatment plant serving 1,660 people in Varzelândia, Minas Gerais, Brazil. It discharges 144.29 m³/day of treated effluent into local water bodies.

Secondary 1,660 Low

Frequently asked

How many wastewater treatment plants are in Brazil?

UtilityRadar indexes 2820 wastewater treatment plants in Brazil, with treatment level, capacity, operator and discharge data on each record.

Who operates wastewater treatment in Brazil?

Among the plants on this page, the most-referenced operator is SANEPAR. UtilityRadar's records show 19 plants linked to this operator.

UtilityRadar
More
Press Esc to close · Browse by sector