Wastewater plants in Brazil

2,820 plants indexed. Showing 1,195 matching current filters.

1,195 plants matching filters

ETE FOSSA FILTRO 2

Itapetinga, Bahia

ETE FOSSA FILTRO 2 is a secondary wastewater treatment plant serving 1,247 people in Itapetinga, Bahia, Brazil. It discharges 136.63 cubic meters of treated effluent daily.

Secondary 1,247 Low

ETE FOSSA FILTRO 1

Itapetinga, Bahia

ETE FOSSA FILTRO 1 is a secondary treatment plant in Itapetinga, Bahia, Brazil, serving 1,247 people. It discharges 136.63 m³/day of treated wastewater, contributing to local water quality management.

Secondary 1,247 Low

ETE VALE DO IPE

Itapetinga, Bahia

ETE Vale do Ipe is a secondary treatment plant serving 1,247 people in Itapetinga, Bahia, Brazil. It discharges 136.63 cubic meters of treated wastewater, supporting local water quality.

Secondary 1,247 Low

ETE ITAJU DO COLoNIA

Itaju do Colônia, Bahia

ETE ITAJU DO COLONIA is a secondary wastewater treatment plant serving Itaju do Colônia, Bahia, Brazil. It treats wastewater for approximately 4,838 people with a discharge volume of 390.12 (unit unspecified).

Secondary 4,838 Low

ETE EUNAPOLIS

Eunápolis, Bahia

ETE Eunapolis is a secondary treatment plant serving 3,306 people in Eunapolis, Bahia, Brazil. It discharges 265.25 cubic meters of treated wastewater daily, supporting local water quality.

Secondary 3,306 Low

ETE ENCRUZILHADA

Encruzilhada, Bahia

ETE Encruzilhada is a secondary wastewater treatment plant serving the town of Encruzilhada in Bahia, Brazil. It treats wastewater for approximately 2,374 residents and discharges 174.89 cubic meters of treated effluent.

Secondary 2,374 Low

ETE SANTA BARBARA PALMAS

Palmas, Tocantins

ETE Santa Barbara Palmas is a secondary treatment plant serving 2,263 people in Palmas, Tocantins, Brazil. It discharges 259.20 cubic meters of treated wastewater daily.

Secondary 2,263 Low

ETE SANTA Fe

Palmas, Tocantins

ETE Santa Fe is a secondary treatment plant serving 4,525 people in Palmas, Tocantins, Brazil. It discharges 518.40 cubic meters of treated wastewater daily.

Secondary 4,525 Low

ETE TALISMA

Talismã, Tocantins

ETE TALISMA is a secondary wastewater treatment plant serving Talismã, Tocantins, Brazil. It discharges approximately 25.19 cubic meters of treated effluent daily.

Secondary 153 Low

ETE SAMPAIO

Sampaio, Tocantins

ETE SAMPAIO is a secondary-level wastewater treatment plant serving Sampaio, Tocantins, Brazil. It treats wastewater for approximately 794 residents with a discharge volume of 71.88 cubic meters.

Secondary 794 Low

ETE PEIXE TO

Peixe, Tocantins

ETE PEIXE TO is a secondary wastewater treatment plant serving Peixe, Tocantins, Brazil. It discharges 432.00 m³/day of treated effluent into local water bodies.

Secondary 1,284 Low

ETE PERNADA

Unknown, Tocantins

ETE PERNADA is a secondary treatment plant serving Monte Santo do Tocantins, Tocantins, Brazil. It discharges 349.03 m³/day of treated wastewater into local waterways.

Secondary 3,199 Low

ETE ITACAJA

Itacajá, Tocantins

ETE ITACAJA is a secondary treatment plant serving Itacajá, Tocantins, Brazil. It discharges approximately 550 m³/day of treated wastewater into the local watershed.

Secondary 3,543 Low

ETE GUARAI

Guaraí, Tocantins

ETE GUARAI is a secondary wastewater treatment plant serving Guaraí, Tocantins, Brazil. It treats municipal wastewater for a population of 2,096 with a discharge volume of 211.57 units.

Secondary 2,096 Low

ETE SINHA

Palmeirante, Tocantins

ETE SINHA is a secondary wastewater treatment plant serving Palmeirante, Tocantins, Brazil. It treats municipal wastewater for a population of 6,465 with a discharge volume of 640.80 cubic meters.

Secondary 6,465 Low

ETE CARRASCO BONITO

Carrasco Bonito, Tocantins

ETE CARRASCO BONITO is a secondary treatment plant in Carrasco Bonito, Tocantins, Brazil, serving approximately 1,250 people. It discharges 89.86 cubic meters of treated wastewater daily.

Secondary 1,250 Low

ETE AUGUSTINOPOLIS

Augustinópolis, Tocantins

ETE AUGUSTINOPOLIS is a secondary wastewater treatment plant serving Augustinópolis, Tocantins, Brazil. It treats wastewater for a population of 3,823 and discharges 446.69 cubic meters of treated effluent.

Secondary 3,823 Low

ETE VILA AZUL

Araguaína, Tocantins

ETE VILA AZUL is a secondary-level wastewater treatment plant serving 6,287 people in Araguaína, Tocantins, Brazil. It discharges 501.12 cubic meters of treated effluent daily.

Secondary 6,287 Low

ETE ANANAS

Ananás, Tocantins

ETE ANANAS is a secondary wastewater treatment plant serving the small population of Ananás in Tocantins, Brazil. It discharges treated effluent into the local watershed, contributing to downstream water quality in the Araguaia River basin.

Secondary 856 Low

ETE AGUIARNOPOLIS

Aguiarnópolis, Tocantins

ETE AGUIARNOPOLIS is a secondary wastewater treatment plant serving Aguiarnópolis, Tocantins, Brazil. It treats wastewater for a population of 1,868 with a discharge volume of 864.00 m³/day.

Secondary 1,868 Low

Frequently asked

How many wastewater treatment plants are in Brazil?

UtilityRadar indexes 2820 wastewater treatment plants in Brazil, with treatment level, capacity, operator and discharge data on each record.

Who operates wastewater treatment in Brazil?

Among the plants on this page, the most-referenced operator is BRK Ambiental Tocantins. UtilityRadar's records show 14 plants linked to this operator.

UtilityRadar
More
Press Esc to close · Browse by sector