2,820 plants indexed. Showing 2,197 matching current filters.
ETE PROURB 2 is a secondary treatment plant serving 212 people in Baturité, Ceará, Brazil. It discharges 31.10 m³/day of treated wastewater into the local watershed.
ETE PROURB 1 is a secondary treatment plant serving 159 people in Baturité, Ceará, Brazil. It discharges 23.33 cubic meters of treated wastewater daily, protecting local water resources.
ETE SAO FRANCISCO is a secondary wastewater treatment plant in Baturité, Ceará, Brazil, serving a small population of 697. It discharges 102.48 cubic meters of treated wastewater, supporting local water quality.
ETE Barroquinha is a secondary-level wastewater treatment plant serving Barroquinha, Ceará, Brazil. It treats municipal wastewater for a population of 2,418 and discharges 172.45 cubic meters of treated effluent.
ETE BARRO is a secondary wastewater treatment plant serving Barro, Ceará, Brazil. It treats municipal wastewater for approximately 2,900 residents with a discharge volume of 177.12 units.
ETE Barreira is a secondary wastewater treatment plant in Barreira, Ceará, Brazil, serving approximately 3,195 people with a discharge volume of 480 m³/day.
ETE Barbalha is a secondary treatment plant serving 21,814 people in Barbalha, Ceará, Brazil. It discharges 665.28 m³/day of treated wastewater into local water bodies.
ETE Aurora is a secondary treatment plant serving Aurora, Ceará, Brazil. It treats wastewater from approximately 3,500 residents with a discharge volume of 220.32 m³/day.
ETE Aratuba is a secondary-level wastewater treatment plant serving the municipality of Aratuba in Ceará, Brazil. It treats wastewater for a population of approximately 1,527 and discharges 432.00 cubic meters per day.
ETE Amontada is a secondary treatment plant serving 319 people in Amontada, Ceará, Brazil. It discharges 28.40 m³/day of treated wastewater into the local environment.
ETE Altaneira is a secondary wastewater treatment plant serving Altaneira, Ceará, Brazil. It treats approximately 1,358 people and discharges 87.26 m³/day of treated effluent.
ETE ALCANTARAS is a secondary wastewater treatment plant in Alcântaras, Ceará, Brazil, serving approximately 2,757 people. It discharges 214.27 cubic meters of treated effluent daily.
ETE NOVA XAVANTINA XIQUE XIQUE is a secondary treatment plant serving Xique-Xique, Bahia, Brazil. It discharges approximately 992 m³/day of treated wastewater, protecting local water resources.
ETE Várzea Nova BA is a secondary wastewater treatment plant serving 6,664 people in Várzea Nova, Bahia, Brazil. It discharges 456.33 cubic meters of treated effluent daily.
ETE Varzea da Roca is a secondary treatment plant in Capela do Alto Alegre, Bahia, Brazil, serving a small population of 123. The facility discharges 8.34 units of treated wastewater into the local environment.
ETE Uruçuca is a secondary wastewater treatment plant serving Uruçuca, Bahia, Brazil. It treats wastewater from approximately 11,106 people with a daily discharge volume of 933.76 cubic meters.
ETE UBAIRA is a secondary wastewater treatment plant serving Jiquiriçá, Bahia, Brazil. It treats wastewater for approximately 6,709 people and discharges 452.44 cubic meters per day.
ETE TUCANO is a secondary wastewater treatment plant serving Tucano, Bahia, Brazil. It treats municipal wastewater for approximately 11,004 residents with a discharge volume of 772.03 units.
ETE SANTO ESTEVAO is a secondary wastewater treatment plant in Santo Estêvão, Bahia, Brazil. It serves a population of 1,337 and discharges 90.30 cubic meters of treated wastewater.
ETE CONJ HABITACIONAL PROVIDENCIA is a secondary treatment plant in Santo Antônio de Jesus, Bahia, Brazil, serving nearly 1,000 residents. It discharges treated wastewater into local water bodies.
UtilityRadar indexes 2820 wastewater treatment plants in Brazil, with treatment level, capacity, operator and discharge data on each record.
Among the plants on this page, the most-referenced operator is CAGECE. UtilityRadar's records show 12 plants linked to this operator.