1 plants indexed.
UtilityRadar indexes 1 wastewater treatment plant in Bělá pod Bezdězem, with treatment level, capacity, operator and discharge data on each record.
Among the indexed plants, COV Bela pod Bezdezem has the highest designed capacity at 5,700 m3/day.