Wastewater plants in Grand Est

313 plants indexed. Showing 15 matching current filters.

15 plants matching filters

BETSCHDORF nouvelle

Betschdorf, Grand Est

BETSCHDORF nouvelle is a secondary wastewater treatment plant in Betschdorf, Grand Est, France, serving 4,200 people with a designed capacity of 6,000 m³/day and an average discharge of 749.27 m³/day.

Secondary 4,200 Low

DAMELEVIERES nouvelle station

Damelevières, Grand Est

DAMELEVIERES nouvelle station is a secondary wastewater treatment plant in Damelevières, Grand Est, France, serving approximately 1,350 people with a designed capacity of 9,000 m³/day.

Secondary 1,350 Low

DIEULOUARD

Dieulouard, Grand Est

Dieulouard wastewater treatment plant serves the commune of Dieulouard in Grand Est, France, with secondary treatment for a population of 1,450. It discharges treated effluent into the local water system under EU regulatory standards.

Secondary 1,450 Low

ETAIN

Étain, Grand Est

ETAIN wastewater treatment plant serves Étain, Grand Est, France, with secondary treatment for a population of 2,910. The plant has a designed capacity of 5,000 m³/day and discharges 519.14 m³/day.

Secondary 2,910 Low

HERRLISHEIM PRES COLMAR

Meyenheim, Grand Est

HERRLISHEIM PRES COLMAR is a secondary wastewater treatment plant in Meyenheim, Grand Est, France. It serves 2,600 people with a designed capacity of 2,200 m³/day and discharges 463.84 m³/day.

Secondary 2,600 Low

LAY SAINT CHRISTOPHE

Lay-Saint-Christophe, Grand Est

LAY SAINT CHRISTOPHE is a secondary wastewater treatment plant in Lay-Saint-Christophe, Grand Est, France. It serves approximately 1,450 people with a discharge volume of 258.68 m³/day.

Secondary 1,450 Low

MOLLKIRCH

Mollkirch, Grand Est

MOLLKIRCH wastewater treatment plant serves Mollkirch, Grand Est, France. It provides secondary treatment for a population of 2,000, discharging 356.80 m³/day.

Secondary 2,000 Low

OERMINGEN

Hutting, Grand Est

OERMINGEN wastewater treatment plant serves the Hutting area in Grand Est, France. It provides secondary treatment for a population of 2,500 with a designed capacity of 2,000 m³/day.

Secondary 2,500 Low

PLOBSHEIM

Plobsheim, Grand Est

PLOBSHEIM wastewater treatment plant serves 3,400 people in Plobsheim, Grand Est, France. It provides secondary treatment and discharges 606.55 cubic meters of treated effluent daily.

Secondary 3,400 Low

PLOMBIERES LES BAINS

Plombières-les-Bains, Grand Est

PLOMBIERES LES BAINS wastewater treatment plant serves the commune of Plombières-les-Bains in the Grand Est region of France. It provides secondary treatment for a population of 1,700.

Secondary 1,700 Low

SARRALBE WILLERWALD

Herbitzheim, Grand Est

SARRALBE WILLERWALD is a secondary wastewater treatment plant in Herbitzheim, Grand Est, France, serving 4,400 people with a designed capacity of 12,500 m³/day and an average discharge of 784.95 m³/day.

Secondary 4,400 Low

SE SUNDHOUSE SCHOENAU

Schœnau, Grand Est

SE SUNDHOUSE SCHOENAU is a secondary wastewater treatment plant serving Schœnau, Grand Est, France. It treats wastewater for 3,700 people with a designed capacity of 3,000 m³/day and an average discharge volume of 660 m³/day.

Secondary 3,700 Low

STUTZHEIM OFFENHEIM

Stutzheim-Offenheim, Grand Est

STUTZHEIM OFFENHEIM is a secondary wastewater treatment plant in Stutzheim-Offenheim, Grand Est, France, serving 3,300 people with a designed capacity of 4,500 m³/day.

Secondary 3,300 Low

VAUCOULEURS

Vaucouleurs, Grand Est

VAUCOULEURS wastewater treatment plant serves the commune of Vaucouleurs in Grand Est, France. It provides secondary treatment for a population of 790, with a designed capacity of 3000 m³/day.

Secondary 790 Low

VINCEY

Charmes, Grand Est

VINCEY wastewater treatment plant in Charmes, Grand Est, France, is a secondary treatment facility that is currently closed. It served the local community under the EU Urban Waste Water Treatment Directive.

Secondary Low
UtilityRadar
More
Press Esc to close · Advanced search