Wastewater plants in Bayern

995 plants indexed. Showing 839 matching current filters.

839 plants matching filters

Ustersbach

Mödishofen, Bayern

Ustersbach wastewater treatment plant in Mödishofen, Bavaria, Germany, serves about 11,233 people with advanced treatment. It discharges 670.12 m³/day and has a designed capacity of 12,000 m³/day.

Advanced 11,233 Low

Rossbach

Schmiedorf, Bayern

Rossbach wastewater treatment plant in Schmiedorf, Bavaria, Germany, serves a population of 9,826 with advanced treatment and a designed capacity of 30,000 m³/day, discharging 689.15 m³/day.

Advanced 9,826 Low

Johanniskirchen

Johanniskirchen, Bayern

Johanniskirchen wastewater treatment plant in Bavaria, Germany serves about 2,400 people with secondary treatment. It discharges approximately 867 m³/day and has a designed capacity of 4,980 m³/day.

Secondary 2,383 Low

Triftern

Triftern, Bayern

Triftern wastewater treatment plant in Bayern, Germany, serves 3,400 people with advanced treatment. It discharges 775.73 m³/day and has a designed capacity of 4,000 m³/day.

Advanced 3,400 Low

Egglham

Egglham, Bayern

Egglham wastewater treatment plant in Bavaria, Germany serves about 2,000 people with secondary treatment. It has a designed capacity of 3,000 m³/day and discharges 621.76 m³/day.

Secondary 2,000 Low

Tann

Tann, Bayern

Tann wastewater treatment plant in Bayern, Germany, serves 3,100 people with advanced treatment. It discharges 506.83 thousand m³/year and has a designed capacity of 12,000 m³/day.

Advanced 3,100 Low

Hebertsfelden

Linden, Bayern

Hebertsfelden wastewater treatment plant in Linden, Bavaria, Germany, serves 3,000 people with advanced treatment. It discharges 677.48 m³/day and has a designed capacity of 4,150 m³/day.

Advanced 3,000 Low

Grafenau OT Furth

Saldenburg, Bayern

Grafenau OT Furth is an advanced wastewater treatment plant in Saldenburg, Bayern, Germany, serving approximately 2,545 people with a designed capacity of 6,500 m³/day and a discharge volume of 960.44 m³/day.

Advanced 2,545 Low

Grainet

Rehberg, Bayern

Grainet wastewater treatment plant in Rehberg, Bavaria, Germany, serves 2,586 people with secondary treatment. It discharges 966.35 m³/day and has a designed capacity of 4,000 m³/day.

Secondary 2,586 Low

Eppenschlag Kirchdorf

Marbach, Bayern

Eppenschlag Kirchdorf wastewater treatment plant in Marbach, Bavaria, Germany, serves about 4,320 people with secondary treatment. It discharges 927.57 m³/day and has a designed capacity of 4,100 m³/day.

Secondary 4,320 Low

Hinterschmiding

Sonndorf, Bayern

Hinterschmiding wastewater treatment plant in Sonndorf, Bavaria, Germany, serves approximately 3,656 people with secondary treatment. It discharges 857.88 thousand cubic meters annually, operating under EU Urban Waste Water Treatment Directive standa

Secondary 3,656 Low

Neureichenau

Kernberg, Bayern

Neureichenau wastewater treatment plant in Kernberg, Bavaria, Germany, serves approximately 2,724 people with secondary treatment. It discharges 811.17 m³/day and has a designed capacity of 6,000 m³/day.

Secondary 2,724 Low

HAIDMUEHLE

Haidmühle, Bayern

Haidmühle wastewater treatment plant in Bavaria, Germany serves 2,315 people with secondary treatment. It has a designed capacity of 4,000 m³/day and discharges 990 m³/day of treated effluent.

Secondary 2,315 Low

Innernzell

Gmünd, Bayern

Innernzell wastewater treatment plant in Gmünd, Bavaria, Germany, serves 2,506 people with secondary treatment. It discharges 634.21 m³/day and has a designed capacity of 3,600 m³/day.

Secondary 2,506 Low

Salzweg OT Strasskirchen

Tiefenbach, Bayern

Salzweg OT Strasskirchen is an advanced wastewater treatment plant in Tiefenbach, Bavaria, Germany. It serves a population of 2,107 with a designed capacity of 3,800 m³/day and discharges 716.17 m³/day.

Advanced 2,107 Low

Aicha vorm Wald

Niederham, Bayern

Aicha vorm Wald wastewater treatment plant serves the community of Niederham in Bavaria, Germany, with advanced treatment for a population equivalent of 5,955. The plant discharges treated wastewater into local waterways, contributing to the protecti

Advanced 5,955 Low

Ruderting

Fischhaus, Bayern

Ruderting wastewater treatment plant in Fischhaus, Bayern, Germany provides advanced treatment for a population of 2,186. The plant discharges treated water into local water bodies, supporting the Danube basin ecosystem.

Advanced 2,186 Low

Furstenstein

Neukirchen vorm Wald, Bayern

Furstenstein wastewater treatment plant in Neukirchen vorm Wald, Bayern, Germany, serves 2,638 people with secondary treatment. The facility has a designed capacity of 4,000 m³/day and discharges 586.95 m³/day.

Secondary 2,638 Low

Neukirchen vorm Wald

Neukirchen vorm Wald, Bayern

Neukirchen vorm Wald wastewater treatment plant in Bavaria, Germany serves 2,390 people with secondary treatment. It discharges 525.52 m³/day and has a designed capacity of 2,600 m³/day.

Secondary 2,390 Low

Haarbach Wolfachtal

Rainding, Bayern

Haarbach Wolfachtal is a secondary treatment plant serving 2,190 people in Rainding, Bavaria, Germany. It discharges 864.59 m³/day of treated wastewater into the local watershed.

Secondary 2,190 Low

Frequently asked

How many wastewater treatment plants are in Bayern?

UtilityRadar indexes 995 wastewater treatment plants in Bayern, with treatment level, capacity, operator and discharge data on each record.

What is the largest wastewater treatment plant in Bayern?

Among the indexed plants, Rossbach has the highest designed capacity at 30,000 m3/day.

UtilityRadar
More
Press Esc to close · Browse by sector