Wastewater plants in Bayern

995 plants indexed. Showing 986 matching current filters.

986 plants matching filters

Mettenheim OT Hart

Mühldorf a. Inn, Bayern

Mettenheim OT Hart is an advanced wastewater treatment plant in Mühldorf a. Inn, Bayern, Germany, serving approximately 3,400 people. It discharges treated wastewater into the local water system with a design capacity of 6,000 m³/day.

Advanced 3,407 Low

BUCHBACH

Buchbach, Bayern

BUCHBACH wastewater treatment plant in Buchbach, Bayern, Germany, serves a population of 2,147 with advanced treatment. It discharges 543.35 m³/day and has a designed capacity of 4,000 m³/day.

Advanced 2,147 Low

Schwindegg

Wörth, Bayern

Schwindegg wastewater treatment plant in Wörth, Bavaria, Germany, serves about 3,400 people with secondary treatment. It discharges 685 m³/day and has a design capacity of 4,875 m³/day.

Secondary 3,417 Low

Rechtmehring

Freimehring, Bayern

Rechtmehring wastewater treatment plant in Freimehring, Bavaria, Germany, serves about 2,947 people with advanced treatment. It discharges 328.32 cubic meters per day and has a designed capacity of 3,000 cubic meters per day.

Advanced 2,947 Low

Irschenberg

Irschenberg, Bayern

Irschenberg wastewater treatment plant in Bavaria, Germany serves about 2,800 people with advanced treatment. It discharges 406 m³/day and has a designed capacity of 5,000 m³/day.

Advanced 2,823 Low

Valley

Unterdarching, Bayern

Valley wastewater treatment plant in Unterdarching, Bayern, Germany serves 2,163 people with advanced treatment. It has a designed capacity of 5,000 m³/day and discharges 398.18 m³/day.

Advanced 2,163 Low

Bach ad Donau

Demling, Bayern

Bach ad Donau wastewater treatment plant in Demling, Bavaria, Germany, serves 2,160 people with advanced treatment. It has a designed capacity of 2,700 m³/day and discharges 546.64 m³/day.

Advanced 2,160 Low

Laaber OT Waldetzenberg

Edlhausen, Bayern

Laaber OT Waldetzenberg is a closed advanced wastewater treatment plant in Edlhausen, Bavaria, Germany. It served a population of 1,385 with a designed capacity of 2,500 m³/day.

Advanced 1,385 Low

Pfakofen

Pfakofen, Bayern

Pfakofen wastewater treatment plant in Bavaria, Germany, serves 960 people with secondary treatment. The plant is now closed, having discharged treated effluent into the local watershed.

Secondary 960 Low

Sinzing

Regensburg, Bayern

Sinzing wastewater treatment plant in Regensburg, Bavaria, Germany, serves 2,038 people with advanced treatment. It discharges 826.95 m³/day and has a designed capacity of 5,800 m³/day.

Advanced 2,038 Low

Nittendorf OT Etterzhausen

Sinzing, Bayern

Nittendorf OT Etterzhausen wastewater treatment plant in Sinzing, Bavaria, Germany, serves a population of 2,186 with advanced treatment. The plant has a designed capacity of 6,300 m³/day and discharges 710.55 m³/day.

Advanced 2,186 Low

Pfatter

Pfatter, Bayern

Pfatter wastewater treatment plant in Bayern, Germany, serves 2,698 people with advanced treatment. It discharges 465.77 m³/day and has a designed capacity of 6,000 m³/day.

Advanced 2,698 Low

Bernhardswald

Bernhardswald, Bayern

Bernhardswald wastewater treatment plant in Bavaria, Germany, serves a population of 1,929 with advanced treatment. Though currently closed, it was designed for a capacity of 6,300 m³/day and discharges 659 m³/day.

Advanced 1,929 Low

Kallmunz

Krachenhausen, Bayern

Kallmunz wastewater treatment plant in Krachenhausen, Bayern, Germany, serves a population of 3,403 with advanced treatment. It discharges 441.12 thousand cubic meters annually, with a designed capacity of 3,000.

Advanced 3,403 Low

Sunching

Mötzing, Bayern

Sunching wastewater treatment plant in Mötzing, Bayern, Germany, serves 2,310 people with advanced treatment and a designed capacity of 5,000 m³/day.

Advanced 2,310 Low

Beratzhausen

Beratzhausen, Bayern

Beratzhausen wastewater treatment plant in Bavaria, Germany serves approximately 4,000 people with secondary treatment. The facility discharges treated effluent into the local watershed, supporting downstream water quality in the Danube basin.

Secondary 3,992 Low

Hagelstadt

Gailsbach, Bayern

Hagelstadt wastewater treatment plant in Gailsbach, Bavaria, Germany, serves 1,742 people with secondary treatment. The plant is now closed, with a designed capacity of 3,000 m³/day and a discharge volume of 440.86 m³/day.

Secondary 1,742 Low

Breitenbrunn

Breitenegg, Bayern

Breitenbrunn wastewater treatment plant in Breitenegg, Bavaria, Germany serves 2,400 people with advanced treatment. It discharges 450 m³/day and has a designed capacity of 3,000 m³/day.

Advanced 2,400 Low

Deining

Mittersthal, Bayern

Deining wastewater treatment plant in Mittersthal, Bavaria, Germany, serves a population of 3,612 with advanced treatment. It has a designed capacity of 4,800 m³/day and discharges 925.88 m³/day of treated effluent.

Advanced 3,612 Low

Breitenbrunn OT Kemnathen

Kemnathen, Bayern

Breitenbrunn OT Kemnathen is an advanced wastewater treatment plant in Kemnathen, Bavaria, Germany. It serves a population of 2,150 and has a designed capacity of 3,600 m³/day.

Advanced 2,150 Low

Frequently asked

How many wastewater treatment plants are in Bayern?

UtilityRadar indexes 995 wastewater treatment plants in Bayern, with treatment level, capacity, operator and discharge data on each record.

What is the largest wastewater treatment plant in Bayern?

Among the indexed plants, Nittendorf OT Etterzhausen has the highest designed capacity at 6,300 m3/day.

UtilityRadar
More
Press Esc to close · Browse by sector