995 plants indexed. Showing 986 matching current filters.
Eurasburg wastewater treatment plant in Geretsried, Bavaria, Germany, serves 8,000 people with advanced treatment. It discharges 741.81 cubic meters per day and has a designed capacity of 4,300 cubic meters per day.
Fahrenzhausen wastewater treatment plant in Weng, Bayern, Germany, serves about 4,800 people with advanced treatment. It discharges 959 m³/day and has a design capacity of 6,000 m³/day.
Falkenstein wastewater treatment plant in Breitenbach, Bavaria, Germany serves 2,642 people with secondary treatment. The plant has a designed capacity of 3,500 m³/day and discharges 889.73 m³/day of treated effluent.
Fensterbach wastewater treatment plant in Bavaria, Germany serves about 2,300 people with secondary treatment. It discharges 787 m³/day of treated effluent, operating under EU Urban Waste Water Treatment Directive standards.
Flachslanden wastewater treatment plant serves Borsbach, Germany, with advanced treatment for a population of 2,000. It discharges 506.15 m³/day and has a designed capacity of 2,500 m³/day.
Fraunberg wastewater treatment plant in Riding, Bavaria, Germany serves 2,072 people with advanced treatment. It discharges 581.75 m³/day and has a designed capacity of 3,600 m³/day.
Freihung wastewater treatment plant in Elbart, Bavaria, Germany, serves a population of 3,454 with advanced treatment. It discharges 847.15 m³/day and has a designed capacity of 3,000 m³/day.
Freudenberg wastewater treatment plant serves the community of Lintach, Germany, with secondary treatment. It has a designed capacity of 4,500 m³/day and discharges treated effluent into local waterways.
Fridolfing wastewater treatment plant in Bayern, Germany serves about 4,500 people with advanced treatment. It discharges 872 m³/day and has a designed capacity of 3,450 m³/day.
Friedenfels wastewater treatment plant serves the town of Friedenfels in Bavaria, Germany. It provides secondary treatment for a population of approximately 3,017 and has a designed capacity of 7,000 m³/day.
Furstenstein wastewater treatment plant in Neukirchen vorm Wald, Bayern, Germany, serves 2,638 people with secondary treatment. The facility has a designed capacity of 4,000 m³/day and discharges 586.95 m³/day.
Furth wastewater treatment plant in Edlmannsberg, Bavaria, Germany, serves a population of 2,554 with secondary treatment. It discharges 493.26 m³/day and has a designed capacity of 4,000 m³/day.
Gachenbach wastewater treatment plant in Weilach, Bavaria, Germany, serves a population of 2,069 with secondary treatment. The plant has a designed capacity of 3,000 m³/day and discharges 529.90 m³/day.
Gars_Inn is an advanced wastewater treatment plant in Gars-Bahnhof, Bavaria, Germany, serving 4,627 people with a designed capacity of 5,600 m³/day and a discharge volume of 621.27 m³/day.
GEISELBACH wastewater treatment plant in Omersbach, Bayern, Germany, serves a population of 1,300. The plant is closed and provided advanced treatment.
Gemeinde Altfraunhofen is a secondary wastewater treatment plant in Altfraunhofen, Bavaria, Germany, serving approximately 2,587 people. It discharges treated wastewater into local water bodies under EU regulatory standards.
Gemeinde Buch am Erlbach is a secondary treatment plant serving 2,280 people in Moosburg, Bavaria, Germany. It discharges 919.66 m³/day of treated wastewater into local waterways.
Geroda wastewater treatment plant in Platz, Bayern, Germany, serves 837 people with secondary treatment. The plant is now closed, with a designed capacity of 1,200 m³/day and discharge volume of 211.82 m³/day.
Gerolsbach wastewater treatment plant in Bavaria, Germany serves about 2,800 people with advanced treatment. It discharges 707 m³/day of treated effluent into the local watershed.
GERZEN wastewater treatment plant in Gerzen, Bayern, Germany, serves a population of 1,922 with advanced treatment. The plant is now closed, having had a designed capacity of 2,800 m³/day.