141 plants indexed. Showing 8 matching current filters.
Bibra wastewater treatment plant in Thüringen, Germany, serves 1,767 people with secondary treatment. The plant is now closed, having had a designed capacity of 3,500 m³/day and a discharge volume of 447.19 m³/day.
Buttstedt wastewater treatment plant in Büttstedt, Thüringen, Germany, serves 1,620 people with secondary treatment. The plant is now closed, with a designed capacity of 2,600 m³/day and annual discharge volume of 409.98 m³.
Grossmehlra wastewater treatment plant in Schlotheim, Thüringen, Germany, serves 934 people with secondary treatment. The plant is now closed.
Hainspitz wastewater treatment plant in Aubitz, Thüringen, Germany, serves a population of 1,550 with secondary treatment. The plant is now closed, having had a designed capacity of 2,400 m³/day.
Juchsen wastewater treatment plant in Jüchsen, Thüringen, Germany, is a secondary treatment facility serving 1,534 people. Now closed, it had a designed capacity of 2,200 m³/day and discharged 388.22 m³/day.
Kerspleben wastewater treatment plant in Erfurt, Thüringen, Germany, served 2,077 people with secondary treatment before closure. It had a designed capacity of 3,000 m³/day and discharged 525.64 m³/day.
Leutenthal wastewater treatment plant in Thüringen, Germany serves a small population of 1,783 with secondary treatment. The plant is now closed and discharges 388.30 m³/day.
Menteroda wastewater treatment plant in Thüringen, Germany, serves a small population of 1,723 with secondary treatment. The plant is now closed.