4,257 plants indexed. Showing 806 matching current filters.
Germany operates one of the most comprehensive wastewater networks in the world. Treatment is mandated at municipal level under the Federal Water Act and EU UWWTD. UtilityRadar indexes 4257 wastewater treatment plants in Germany with a combined designed capacity of 6,530,097 m³/day. The largest plant on file is Frankfurt Am Main _ Flughafen, treating 90,000 m³/day.
Germany operates one of the most comprehensive wastewater networks in the world. Treatment is mandated at municipal level under the Federal Water Act and EU UWWTD.
UtilityRadar's directory currently lists 4,257 wastewater treatment plants across Germany. Together these plants represent a combined designed capacity of approximately 6,530,097 m³/day.
By treatment level, the directory contains 1000 advanced, 383 secondary-treatment plants. Secondary treatment (typically activated sludge with biological nutrient removal) is the most common standard.
The largest plant indexed for Germany is Frankfurt Am Main _ Flughafen, with a designed capacity of 90,000 m³/day.
Plant records are aggregated from publicly available regulatory data (US EPA ECHO, EU UWWTD reporting, national water authority publications), augmented by direct operator information and verified via Google Maps coordinates. Each record includes location, treatment level, capacity where known, operator and operational status. To browse plants by treatment level worldwide, see our secondary and advanced filter views, or read our guide to how sewage treatment works.
Kist wastewater treatment plant in Bavaria, Germany serves 3,439 people with advanced treatment. The facility has a designed capacity of 4,600 m³/day and discharges 500.89 m³/day of treated effluent.
Aub wastewater treatment plant in Bayern, Germany serves approximately 3,167 people with advanced treatment. It discharges 528.44 cubic meters per day and has a designed capacity of 6,000 cubic meters per day.
Guntersleben wastewater treatment plant in Bayern, Germany, serves about 4,663 people with advanced treatment. It discharges 779.27 m³/day and has a designed capacity of 6,500 m³/day.
Weibersbrunn wastewater treatment plant serves the Rohrbrunner Forst area in Bavaria, Germany, with advanced treatment for a population of 2,595. The plant has a designed capacity of 3,500 m³/day and discharges 808.77 m³/day.
SKA Schönach is an advanced wastewater treatment plant serving Kleinschönach, Baden-Württemberg, Germany. It treats wastewater from around 2,050 people with a designed capacity of 2,400 m³/day.
SKA SCHEER is an advanced wastewater treatment plant in Scheer, Baden-Württemberg, Germany. It serves about 5,050 people and discharges 720.11 thousand cubic meters annually.
SKA WALD is an advanced wastewater treatment plant in Wald, Baden-Württemberg, Germany, serving 2,450 people with a designed capacity of 4,100 m³/day.
SKA STETTEN STORZINGEN is an advanced wastewater treatment plant in Storzingen, Baden-Württemberg, Germany. It serves a population of 2,676 and discharges 768.49 m³/day of treated water.
SKA Dörren is an advanced wastewater treatment plant in Kißlegg, Baden-Württemberg, Germany, serving a population of 5,250. It operates under the EU Urban Waste Water Treatment Directive.
SKA BERGATREUTE is an advanced wastewater treatment plant in Bergatreute, Baden-Württemberg, Germany, serving approximately 3,750 people with a designed capacity of 5,000 m³/day.
SKA WOLFEGG is an advanced wastewater treatment plant in Alttann, Baden-Württemberg, Germany, serving 4,350 people. It discharges 980.69 m³/day of treated effluent into local waterways.
SKA BODNEGG is an advanced wastewater treatment plant in Rosenharz, Baden-Württemberg, Germany, serving 4,550 people. It has a designed capacity of 6,000 m³/day and discharges 817.07 m³/day of treated effluent.
SKA BLIDERAZHOFEN is an advanced wastewater treatment plant in Christazhofen, Baden-Württemberg, Germany. It serves a population of 2,100 and has a designed capacity of 1,500 m³/day.
SKA Urbanstobel is an advanced wastewater treatment plant in Kappel, Baden-Württemberg, Germany, serving approximately 3,150 people. It discharges treated water near the coast and operates under the EU Urban Waste Water Treatment Directive.
SKA UTTENWEILER is an advanced wastewater treatment plant serving about 3,050 people in Uttenweiler, Baden-Württemberg, Germany. It has a designed capacity of 3,300 m³/day and discharges treated water into local waterways.
SKA FoeRAMOOS is an advanced wastewater treatment plant in Eberhardzell, Baden-Württemberg, Germany. It serves 2,400 people with a designed capacity of 1,650 m³/day and a discharge volume of 607.38 m³/day.
SKA Heroldstatt is an advanced wastewater treatment plant serving Blaubeuren, Baden-Württemberg, Germany. It treats wastewater for approximately 3,550 people with a designed capacity of 7,100 m³/day.
SKA Asselfingen is an advanced wastewater treatment plant in Asselfingen, Baden-Württemberg, Germany, serving a population of 2,550 with a designed capacity of 2,500 m³/day.
SKA Westerheim is an advanced wastewater treatment plant in Westerheim, Baden-Württemberg, Germany, serving approximately 4,150 people. It has a designed capacity of 5,500 m³/day and discharges treated water into local water bodies.
SKA Setzingen is an advanced wastewater treatment plant in Setzingen, Baden-Württemberg, Germany, serving approximately 3,550 people. It has a designed capacity of 2,600 m³/day and discharges 716.41 m³/day.
UtilityRadar indexes 4257 wastewater treatment plants in Germany, with treatment level, capacity, operator and discharge data on each record.
Among the indexed plants, SKA DoeRREN has the highest designed capacity at 8,350 m3/day.