4,257 plants indexed. Showing 4,033 matching current filters.
Apenburg wastewater treatment plant in Sachsen-Anhalt, Germany, serves 1,940 people with advanced treatment. It discharges 490.97 m³/day and has a designed capacity of 2,230 m³/day.
Arendsee_Thielbeer is an advanced wastewater treatment plant in Arendsee (Altmark), Saxony-Anhalt, Germany, serving about 5,065 people with a designed capacity of 19,000 m³/day.
Argenbuhl Eglofs is a closed secondary wastewater treatment plant in Lengatz, Bayern, Germany, serving a population of 1,850. It discharged 468.19 m³/day and had a designed capacity of 1,800 m³/day.
Arneburg IGPA Stendal Ost is a secondary treatment plant in Arneburg, Saxony-Anhalt, Germany, serving 1,713 people with a designed capacity of 2,200 m³/day.
Arnschwang wastewater treatment plant in Nößwartling, Bavaria, Germany serves about 2,164 people with secondary treatment. The plant has a designed capacity of 3,500 m³/day and discharges 436.75 m³/day.
Aub wastewater treatment plant in Bayern, Germany serves approximately 3,167 people with advanced treatment. It discharges 528.44 cubic meters per day and has a designed capacity of 6,000 cubic meters per day.
Auderath Schmitt Schmitt is an advanced wastewater treatment plant in Schmitt, Rhineland-Palatinate, Germany, serving approximately 3,100 people with a design capacity of 3,800 m³/day.
AUERBACH OT MICHELFELD is a closed advanced treatment plant in Auerbach in der Oberpfalz, Bavaria, Germany. It served a population of 1,623 with a designed capacity of 2,400 m³/day.
Aufsess wastewater treatment plant serves Heckenhof, Germany, with secondary treatment for a population of 2,243. Designed capacity is 3,000 m³/day, with an average discharge of 567.65 m³/day.
Augustusburg wastewater treatment plant in Saxony, Germany serves about 2,490 people with secondary treatment. It discharges 373.5 m³/day and has a designed capacity of 4,000 m³/day.
Aukrug Bunzen is an advanced wastewater treatment plant in Aukrug, Schleswig-Holstein, Germany. It serves approximately 3,945 people with a designed capacity of 7,000 m³/day.
Auma wastewater treatment plant in Thüringen, Germany, serves 2,151 people with advanced treatment. It discharges 673.35 m³/day and has a designed capacity of 3,100 m³/day.
Aumuhle wastewater treatment plant in Görsbach, Thüringen, Germany, serves 7,056 people with advanced treatment. It has a designed capacity of 10,000 m³/day and discharges 681.57 m³/day.
AZV Schlammersdorf Vorbach is a closed advanced treatment plant in Oberbibrach, Bavaria, Germany. It served a population of 1,830 with a designed capacity of 2,900 m³/day.
Baar Schwaben is a secondary wastewater treatment plant in Baar, Bavaria, Germany, serving approximately 7,200 people. It discharges treated wastewater into local waterways, supporting the region's water quality.
Babensham Schambach is an advanced wastewater treatment plant in Babensham, Bavaria, Germany, serving approximately 2,280 people with a designed capacity of 4,200 m³/day.
Bach ad Donau wastewater treatment plant in Demling, Bavaria, Germany, serves 2,160 people with advanced treatment. It has a designed capacity of 2,700 m³/day and discharges 546.64 m³/day.
Bad Bayersoien wastewater treatment plant in Bavaria, Germany, serves 1,250 people with advanced treatment. The plant is now closed, but its infrastructure supported the local community in the Ammer River watershed.
Bad Bertrich wastewater treatment plant in Beuren, Rheinland-Pfalz, Germany, serves 2,641 people with advanced treatment. It has a designed capacity of 2,700 m³/day and discharges 684.93 m³/day.
Bad Boll Eckwalden is a secondary treatment plant in Eckwälden, Baden-Württemberg, Germany, serving 1,750 people. It is now closed.