24 plants indexed. Showing 4 matching current filters.
Salawala wastewater treatment plant in Dehradun, Uttarakhand, India, is under construction with secondary treatment. It will serve a population of 4,744 and has a designed capacity of 710 cubic meters per day.
Vijay Colony wastewater treatment plant in Dehradun, Uttarakhand, India, is under construction with secondary treatment. It serves a population of 2,806 and has a designed capacity of 420 m³/day.
Kulri wastewater treatment plant in Library Bazaar, Dehradun, Uttarakhand, India, is under construction with secondary treatment. It serves a population of 6,013 and has a designed capacity of 900 m³/day.
Landhor North is a secondary treatment plant under construction in Mussoorie, Uttarakhand, India. Designed to treat 800 cubic meters per day, it will serve a population of 5,345.
UtilityRadar indexes 24 wastewater treatment plants in Uttarakhand, with treatment level, capacity, operator and discharge data on each record.
Among the indexed plants, Kulri has the highest designed capacity at 900 m3/day.