1 plants indexed.
MASCHITO_BOIGO is a secondary treatment plant serving Maschito, Basilicata, Italy. It discharges 370.19 m³/day of treated wastewater into the local watershed.
UtilityRadar indexes 1 wastewater treatment plant in Maschito, with treatment level, capacity, operator and discharge data on each record.
Among the indexed plants, MASCHITO_BOIGO has the highest designed capacity at 3,500 m3/day.