417 plants indexed. Showing 4 matching current filters.
ALTOMONTE CENTRO S ELIA is a primary treatment plant in Sangineto Lido, Calabria, Italy, serving 2,194 people with a designed capacity of 2,800 m³/day and a discharge volume of 434.33 m³/day.
Molochio Gera is a secondary wastewater treatment plant serving Stilo, Calabria, Italy. It discharges treated wastewater near the Ionian Sea coast, with a designed capacity of 4,000 m³/day.
PLATI_CIRELLA is a primary treatment plant in Brancaleone, Calabria, Italy, serving 500 people. It discharges 98.98 m³/day of wastewater near the Ionian Sea coast.
PORTIGLIOLA_ARDORE_VESCOVATO is a secondary treatment plant in Careri, Calabria, Italy, serving 2,150 people. It discharges 425.62 m³/day of treated wastewater and is located within 10 km of the coast.