417 plants indexed. Showing 210 matching current filters.
GEROCARNE_MANCUSO is a primary treatment plant serving 230 people in Sant'Angelo di Gerocarne, Calabria, Italy. It discharges 45.53 m³/day of treated wastewater into the local watershed.
GEROCARNE_LANZO_DOMITO is a primary treatment plant serving 80 people in Sant'Angelo di Gerocarne, Calabria, Italy. It discharges 15.84 m³/day of treated wastewater into the local watershed.
GEROCARNE_FAGO is a primary treatment plant in Sorianello, Calabria, Italy, serving 80 people. It discharges 15.84 cubic meters of treated wastewater, operating under EU Urban Waste Water Treatment Directive standards.
Gerocarne Carruso is a primary treatment plant serving 40 people in Gerocarne, Calabria, Italy. It discharges 7.92 m³/day of treated wastewater into local water bodies.
GEROCARNE_BONDANZIA is a primary treatment plant serving 130 people in Gerocarne, Calabria, Italy. It discharges 25.74 m³/day of treated wastewater, with a designed capacity of 130 m³/day.
Frascineto San Leonardo is a secondary wastewater treatment plant in Frascineto, Calabria, Italy, serving approximately 300 people with a designed capacity of 500 m³/day.
FRASCINETO_FONTANA_BOTTE is a secondary wastewater treatment plant serving Frascineto, Calabria, Italy. It treats wastewater from approximately 1,950 people with a designed capacity of 3,000 m³/day.
COTRONEI_TREPIDO is a secondary wastewater treatment plant serving Villaggio Baffa, Cotronei, in Calabria, Italy. It treats wastewater for approximately 1,000 people with a designed capacity of 5,000 m³/day.
Cotronei C.da Cona is a secondary wastewater treatment plant serving about 5,000 people in Cotronei, Calabria, Italy. It discharges treated effluent into local waterways, supporting environmental protection in the region.
CORTALE_AMALOPATE is a secondary wastewater treatment plant serving Cortale, Calabria, Italy. It treats wastewater from approximately 3,059 residents with a designed capacity of 4,000 m³/day.
CORIGLIANO_CALABRO_APOLLINARA is an advanced wastewater treatment plant serving 1,530 people in Piretto, Calabria, Italy. It discharges 302.89 m³/day and has a designed capacity of 1,200 m³/day.
CONFLENTI SAN MAZZEO is an advanced wastewater treatment plant serving 385 people in San Mazzeo-Sciosci, Calabria, Italy. It discharges 76.22 m³/day of treated effluent.
CONFLENTI_MOZZONI is an advanced wastewater treatment plant in Serra d'Acino, Conflenti, Calabria, Italy. It serves a population of 1,820 with a designed capacity of 2,000 m³/day and discharges 360.30 m³/day.
COLOSIMI_CORACI is a closed secondary wastewater treatment plant in Colosimi, Calabria, Italy, serving 2,745 people with a designed capacity of 2,700 m³/day.
CIVITA_CONICELLE is an advanced wastewater treatment plant in Civita, Calabria, Italy, serving approximately 1,970 people. It has a designed capacity of 2,500 m³/day and discharges 389.99 m³/day.
Cerzeto Croi Fedele is an advanced wastewater treatment plant serving Cerzeto, Calabria, Italy. It treats wastewater from approximately 2,570 residents with a designed capacity of 1,500 m³/day.
CERVA_CAPOLUOGO is a closed secondary wastewater treatment plant in Cerva, Calabria, Italy. It served a small population of 263 with a designed capacity of 2000 m³/day.
CERISANO_VALLI is an advanced wastewater treatment plant serving 750 people in Cerisano, Calabria, Italy. It discharges treated water into the local watershed, supporting environmental protection in the region.
CERISANO_S_IANNI is an advanced wastewater treatment plant serving Santo Ianni, Cerisano, in Calabria, Italy. It treats wastewater for a population of 1,500 with a designed capacity of 2,500 m³/day.
CASTELSILANO_CANALICCHIO secondary treatment plant serves Verzino, Calabria, Italy, treating wastewater for 1,600 people with a designed capacity of 1,200 m³/day and discharge volume of 316.74 m³/day.
UtilityRadar indexes 417 wastewater treatment plants in Calabria, with treatment level, capacity, operator and discharge data on each record.
Among the indexed plants, COTRONEI_C_DA_CONA has the highest designed capacity at 7,000 m3/day.