181 plants indexed. Showing 112 matching current filters.
CASTELLANA_GROTTE_NUOVO wastewater treatment plant serves Castellana Grotte, Puglia, Italy. It treats wastewater from approximately 16,562 people and is located within 50 km of the Adriatic coast.
Cassano delle Murge Vecchio wastewater treatment plant serves the town of Cassano delle Murge in Puglia, Italy. It has a designed capacity of 1.00 and serves a population of 14,640.
CASAMASSIMA wastewater treatment plant serves the town of Casamassima in Puglia, Italy, with a population equivalent of 13,417. The facility is located within 50 km of the Adriatic coast and operates under EU Urban Waste Water Treatment Directive sta
BITONTO wastewater treatment plant serves Bitonto, Puglia, Italy, with a population of 75,750. It has a designed capacity of 1.00 and is located within 50 km of the coast.
BARI_OVEST wastewater treatment plant serves approximately 360,000 people in Bari, Puglia, Italy. It is located near the Adriatic coast and operates under the EU Urban Waste Water Treatment Directive.
BARI_EST is a major wastewater treatment plant serving approximately 460,000 people in Bari, Puglia, Italy. Located near the Adriatic coast, it plays a key role in protecting the marine environment.
The ALTAMURA wastewater treatment plant serves the city of Altamura in Puglia, Italy, with a population equivalent of 93,800. It has a designed capacity of 1.00 unit and operates under the EU Urban Waste Water Treatment Directive.
ALBEROBELLO wastewater treatment plant serves Martina Franca, Puglia, Italy, with a designed capacity of 1.00 and a population served of 7,735. It operates under Italy's implementation of the EU Urban Waste Water Treatment Directive.
ACQUAVIVA DELLE FONTI NUOVO is a municipal wastewater treatment plant serving Acquaviva delle Fonti, Puglia, Italy. It serves a population of approximately 28,000 and is located inland, discharging into local water bodies.
TRINITAPOLI wastewater treatment plant serves the town of Trinitapoli in Puglia, Italy. It is located within 50 km of the coast and has a designed capacity of 1.00, serving a population of 18,144.
The TRANI wastewater treatment plant serves approximately 62,626 people in Trani, Puglia, Italy. It is located within 50 km of the Adriatic Sea coast and operates under the EU Urban Waste Water Treatment Directive.
SPINAZZOLA_NUOVO wastewater treatment plant serves Spinazzola, Puglia, Italy, with a designed capacity of 1.00 volume unit. It operates under Italian and EU regulations for municipal wastewater treatment.
SAN FERDINANDO DI PUGLIA wastewater treatment plant serves Trinitapoli, Puglia, Italy. It is an inland facility with a designed capacity of 1.00 volume units, operating under EU regulations.
Minervino Murge wastewater treatment plant serves the town of Minervino Murge in Puglia, Italy. It is an inland facility designed for a capacity of 1.00 cubic meters per day.
Margherita di Savoia wastewater treatment plant serves 22,403 people in Puglia, Italy. The facility operates under Italy's implementation of the EU Urban Waste Water Treatment Directive.
OTRANTO wastewater treatment plant serves Soleto, Puglia, Italy, with a population equivalent of 17,831. The facility has a designed capacity of 1.00 volume units and operates under Italian regulations implementing the EU Urban Waste Water Treatment
NOVOLI wastewater treatment plant serves Carmiano, Puglia, Italy, with a designed capacity of 1.00 and a population served of 6,851. It operates under Italy's implementation of the EU Urban Waste Water Treatment Directive.
NARDO_ wastewater treatment plant serves Nardò, Puglia, Italy, with a population equivalent of 29,955. The plant operates under Italy's implementation of the EU Urban Waste Water Treatment Directive.
Morciano di Leuca wastewater treatment plant serves the town of Morciano di Leuca in Puglia, Italy. It has a designed capacity of 1.00 and serves a population of 9,015.
Melendugno wastewater treatment plant serves San Foca, Puglia, Italy, with a population equivalent of 46,667. The facility operates under EU Urban Waste Water Treatment Directive 91/271/EEC, which mandates secondary treatment for agglomerations of th
UtilityRadar indexes 181 wastewater treatment plants in Puglia, with treatment level, capacity, operator and discharge data on each record.
Among the indexed plants, CASTELLANA_GROTTE_NUOVO has the highest designed capacity at 1 m3/day.