Wastewater plants in Italy

4,089 plants indexed. Showing 1,005 matching current filters.

1,005 plants matching filters

CERISANO_S_IANNI

Santo Ianni, Calabria

CERISANO_S_IANNI is an advanced wastewater treatment plant serving Santo Ianni, Cerisano, in Calabria, Italy. It treats wastewater for a population of 1,500 with a designed capacity of 2,500 m³/day.

Advanced 1,500 Low

CASTELSILANO_CANALICCHIO

Verzino, Calabria

CASTELSILANO_CANALICCHIO secondary treatment plant serves Verzino, Calabria, Italy, treating wastewater for 1,600 people with a designed capacity of 1,200 m³/day and discharge volume of 316.74 m³/day.

Secondary 1,600 Low

CARERI_CENTRO

Laureana di Borrello, Calabria

CARERI_CENTRO is a secondary wastewater treatment plant serving Laureana di Borrello, Calabria, Italy. It treats wastewater for approximately 965 people with a designed capacity of 2,500 m³/day.

Secondary 965 Low

CACCURI_RUPE

Santa Rania, Calabria

CACCURI_RUPE is a secondary wastewater treatment plant serving 480 people in Santa Rania, Calabria, Italy. It discharges 95.02 m³/day with a designed capacity of 500 m³/day.

Secondary 480 Low

CACCURI_PARTE

Caccuri, Calabria

CACCURI_PARTE is a secondary treatment plant serving 480 people in Caccuri, Calabria, Italy. It discharges 95.02 m³/day of treated wastewater into the local water system.

Secondary 480 Low

CACCURI_CAMPO

Caccuri, Calabria

CACCURI_CAMPO is a secondary wastewater treatment plant serving the town of Caccuri in Calabria, Italy. It has a designed capacity of 1,500 cubic meters per day and serves a population of 1,410.

Secondary 1,410 Low

BUONVICINO_PETRARO

Destro, Calabria

BUONVICINO_PETRARO is an advanced wastewater treatment plant serving Destro, Calabria, Italy. It treats wastewater for a population of 1,215 with a designed capacity of 5,000 m³/day.

Advanced 1,215 Low

AMENDOLARA_PENNINO

Bisignano, Calabria

AMENDOLARA_PENNINO is an advanced wastewater treatment plant in Bisignano, Calabria, Italy, serving 4,200 people. It discharges 831.45 m³/day of treated effluent into local water bodies.

Advanced 4,200 Low

AMARONI_ARGADI

Morano Calabro, Calabria

AMARONI_ARGADI is a primary treatment plant serving Morano Calabro, Italy, with a population equivalent of 3,000. It discharges treated wastewater inland, contributing to local water management in the Calabria region.

Primary 3,000 Low

ACQUAPPESA_TERME

Acquappesa, Calabria

Acquappesa Terme wastewater treatment plant in Calabria, Italy serves about 3,400 people with advanced treatment. It discharges treated effluent near the Tyrrhenian coast, supporting local environmental quality.

Advanced 3,397 Low

IMPIANTO_C_DA_MANDRANOVA

Camporeale, Sicilia

IMPIANTO C DA MANDRANOVA is a secondary wastewater treatment plant serving Camporeale, Sicily, Italy. It treats wastewater for approximately 3,600 residents with a designed capacity of 6,850 cubic meters per day.

Secondary 3,600 Low

IMPIANTO_C_DA_BASTONELLAACQUACALDA

Caltavuturo, Sicilia

IMPIANTO C DA BASTONELLA ACQUACALDA is a secondary wastewater treatment plant serving Caltavuturo, Sicily, Italy. It treats wastewater from a population of 4,616 with a designed capacity of 6,000 m³/day.

Secondary 4,616 Low

IMPIANTO_LOCATI

Locati, Sicilia

Impianto Locati is a secondary wastewater treatment plant serving 811 people in Locati, Sicily, Italy. It discharges 160.55 cubic meters of treated wastewater daily, with a designed capacity of 900 cubic meters.

Secondary 811 Low

IMPIANTO_C_DA_CHIARELLO

Contessa Entellina, Sicilia

Impianto C da Chiarello is a secondary wastewater treatment plant serving Contessa Entellina, Sicily, Italy. It treats wastewater for approximately 1,965 residents with a designed capacity of 2,500 m³/day.

Secondary 1,965 Low

IMPIANTO_C_DA_MALTEMPO

Giuliana, Sicilia

Impianto C Da Maltempo is a secondary treatment plant serving Giuliana, Sicily, Italy. It treats wastewater for approximately 4,000 residents with a designed capacity of 4,000 m³/day.

Secondary 4,000 Low

IMPIANTO_C_DA_API_BACUCCO

Alia, Sicilia

IMPIANTO C DA API BACUCCO is a secondary wastewater treatment plant in Alia, Sicily, Italy, serving approximately 4,500 people with a designed capacity of 5,000 m³/day.

Secondary 4,500 Low

IMPIANTO_C_DA_SALTO

Ferla, Sicilia

Impianto C da Salto is a primary treatment plant in Ferla, Sicily, serving 2,759 people. It discharges 546.18 m³/day of treated wastewater, with a designed capacity of 4,000 m³/day.

Primary 2,759 Low

CDA_GORGAZZO

Salemi, Sicilia

CDA_Gorgazzo is a secondary treatment plant serving Salemi, Sicily, Italy. It treats wastewater for a population of 1,000 with a designed capacity of 1,500 m³/day, discharging 197.96 m³/day.

Secondary 1,000 Low

CDA_FOGGIA

Salemi, Sicilia

CDA_FOGGIA is a secondary wastewater treatment plant serving Salemi, Sicily, Italy. It treats wastewater from a population of 4,746 with a designed capacity of 4,800 m³/day.

Secondary 4,746 Low

CDA_FAVARELLA

Salemi, Sicilia

CDA_FAVARELLA is a secondary wastewater treatment plant serving Salemi, Sicily, Italy. It treats wastewater for a population of 3,314 with a designed capacity of 7,000 m³/day.

Secondary 3,314 Low

Frequently asked

How many wastewater treatment plants are in Italy?

UtilityRadar indexes 4089 wastewater treatment plants in Italy, with treatment level, capacity, operator and discharge data on each record.

What is the largest wastewater treatment plant in Italy?

Among the indexed plants, AMENDOLARA_PENNINO has the highest designed capacity at 7,600 m3/day.

UtilityRadar
More
Press Esc to close · Browse by sector