4,089 plants indexed. Showing 3,052 matching current filters.
IMPIANTO CONSORTILE C DA CASTELLACCIO DI LEONFORTE is a secondary treatment plant serving Leonforte, Sicily, Italy. It has a designed capacity of 21,000 m³/day and serves a population of about 20,836.
Impianto C da Piana is a secondary wastewater treatment plant serving San Cono, Sicily, Italy. It treats wastewater for approximately 3,800 residents with a designed capacity of 3,800 m³/day.
Impianto C da Risata is a secondary wastewater treatment plant in San Michele di Ganzaria, Sicily, Italy, serving about 5,000 people with a designed capacity of 5,000 m³/day.
Impianto C da San Michele is a secondary wastewater treatment plant serving Troina, Sicily, Italy. It treats wastewater for approximately 3,800 residents with a designed capacity of 7,000 m³/day.
Impianto C da Schidaci is a secondary wastewater treatment plant serving Troina, Sicily, Italy. Designed for 7,000 population equivalent, it discharges treated effluent into the local watershed.
SAVELLI_CHIUSA is a secondary wastewater treatment plant serving Savelli, Calabria, Italy. It discharges 556.28 m³/day and has a designed capacity of 2000 m³/day.
Saracena's advanced wastewater treatment plant serves 4,285 people in Calabria, Italy. It has a designed capacity of 6,000 m³/day and discharges 848.28 m³/day.
Sant'Onofrio Scapalegga is an advanced wastewater treatment plant in Sant'Onofrio, Calabria, Italy, serving 4,541 people with a designed capacity of 6,000 m³/day and a discharge volume of 898.96 m³/day.
Santa Sofia d'Epiro Prati Marchiano is an advanced wastewater treatment plant in Santa Sofia d'Epiro, Calabria, Italy, serving a population of 1,075. It discharges treated water into local waterways, supporting environmental protection in the region.
Santa Sofia d'Epiro Mandrie is an advanced wastewater treatment plant in Calabria, Italy, serving 215 people. It discharges 42.56 m³/day of treated effluent, with a designed capacity of 500 m³/day.
Santa Sofia d'Epiro Gaudio is an advanced wastewater treatment plant serving 645 people in Calabria, Italy. It discharges 127.69 cubic meters of treated effluent daily, operating under EU Urban Waste Water Treatment Directive standards.
Santa Sofia d'Epiro Cancello is an advanced wastewater treatment plant in Calabria, Italy, serving 645 people. It discharges 127.69 m³/day of treated effluent, with a designed capacity of 1,000 m³/day.
Santa Sofia d'Epiro ACCI is an advanced wastewater treatment plant in Calabria, Italy, serving 215 people. It discharges 42.56 cubic meters of treated wastewater daily, with a designed capacity of 500 cubic meters per day.
Santa Severina Altilia is a secondary wastewater treatment plant serving 300 people in Altilia, Calabria, Italy. The plant discharges treated wastewater into the local watershed, supporting environmental protection in the region.
Santa Caterina Albanese Ricasoli is an advanced wastewater treatment plant serving 2,000 people in Calabria, Italy. It treats 395.93 m³/day of wastewater and discharges into the local watershed.
Santa Caterina Albanese Macchie is a secondary wastewater treatment plant in Calabria, Italy, serving 595 people with a designed capacity of 600 m³/day and a discharge volume of 117.79 m³/day.
Santa Agata di Esaro Trapesa is an advanced wastewater treatment plant in Sant'Agata di Esaro, Calabria, Italy, serving 4,500 people with a capacity of 2,500 m³/day.
San Vincenzo La Costa San Sisto wastewater treatment plant serves Gesuiti, Italy, with primary treatment for a population of 692. It discharges 136.99 cubic meters of treated wastewater daily.
San Vincenzo La Costa Palazzello wastewater treatment plant serves a small population of 87 in Calabria, Italy. It provides primary treatment and discharges 17.22 m³/day of treated effluent.
Impianto Bompietro is a secondary treatment plant in Bompietro, Sicily, Italy, serving 525 people. It is currently closed, with a designed capacity of 1,300 m³/day and a discharge volume of 103.93 m³/day.
UtilityRadar indexes 4089 wastewater treatment plants in Italy, with treatment level, capacity, operator and discharge data on each record.
Among the indexed plants, IMPIANTO_CONSORTILE_C_DA_CASTELLACCIO_DI_LEONFORTE has the highest designed capacity at 21,000 m3/day.