Wastewater plants in Italy

4,089 plants indexed. Showing 66 matching current filters.

66 plants matching filters

GEROCARNE_FAGO

Sorianello, Calabria

GEROCARNE_FAGO is a primary treatment plant in Sorianello, Calabria, Italy, serving 80 people. It discharges 15.84 cubic meters of treated wastewater, operating under EU Urban Waste Water Treatment Directive standards.

Primary 80 Low

GEROCARNE_CARRUSO

Gerocarne, Calabria

Gerocarne Carruso is a primary treatment plant serving 40 people in Gerocarne, Calabria, Italy. It discharges 7.92 m³/day of treated wastewater into local water bodies.

Primary 40 Low

GEROCARNE_BONDANZIA

Gerocarne, Calabria

GEROCARNE_BONDANZIA is a primary treatment plant serving 130 people in Gerocarne, Calabria, Italy. It discharges 25.74 m³/day of treated wastewater, with a designed capacity of 130 m³/day.

Primary 130 Low

AMARONI_ARGADI

Morano Calabro, Calabria

AMARONI_ARGADI is a primary treatment plant serving Morano Calabro, Italy, with a population equivalent of 3,000. It discharges treated wastewater inland, contributing to local water management in the Calabria region.

Primary 3,000 Low

IMPIANTO_C_DA_SALTO

Ferla, Sicilia

Impianto C da Salto is a primary treatment plant in Ferla, Sicily, serving 2,759 people. It discharges 546.18 m³/day of treated wastewater, with a designed capacity of 4,000 m³/day.

Primary 2,759 Low

IMPIANTO_C_DA_BEATRICE

Vicari, Sicilia

IMPIANTO C DA BEATRICE is a primary wastewater treatment plant serving Vicari, Sicily, Italy. It has a designed capacity of 5,000 m³/day and serves a population of 3,100.

Primary 3,100 Low

IMPIANTO_C_DA_ROCCHE

Pietraperzia, Sicilia

IMPIANTO C DA ROCCHE in Pietraperzia, Sicily, Italy, is a closed primary treatment plant that served 5,000 people. It had a designed capacity of 8,000 m³/day and discharged 989.82 m³/day.

Primary 5,000 Low

IMPIANTO_C_DA_ORTO_PRINCIPE

Buccheri, Sicilia

Impianto C da Orto Principe is a primary treatment plant serving Buccheri, Sicily, Italy. It treats wastewater for 2,264 people with a designed capacity of 3,700 m³/day.

Primary 2,264 Low

IMPIANTO_VILLAGGIO_SAN_MARCO

Piazza Armerina, Sicilia

Impianto Villaggio San Marco is a primary treatment plant serving 235 people in Piazza Armerina, Sicily, Italy. It discharges 46.52 m³/day of treated wastewater into the local environment.

Primary 235 Low

IMPIANTO_CASTIGLIONE_C_DA_S_FRANCESCO

Castiglione di Sicilia, Sicilia

Impianto Castiglione C. da S. Francesco is a primary treatment plant serving Castiglione di Sicilia, Italy. It treats wastewater for 1,852 people with a designed capacity of 2,000 m³/day.

Primary 1,852 Low

IMPIANTO_CENTRO_URBANO

Giumarra, Sicilia

IMPIANTO CENTRO URBANO is a primary treatment plant serving 1,280 people in Giumarra, Sicily, Italy. It discharges 253.40 cubic meters of treated wastewater daily.

Primary 1,280 Low

SAN_VINCENZO_LA_COSTA_SAN_SISTO

Gesuiti, Calabria

San Vincenzo La Costa San Sisto wastewater treatment plant serves Gesuiti, Italy, with primary treatment for a population of 692. It discharges 136.99 cubic meters of treated wastewater daily.

Primary 692 Low

SAN_VINCENZO_LA_COSTA_PALAZZELLO

San Vincenzo La Costa, Calabria

San Vincenzo La Costa Palazzello wastewater treatment plant serves a small population of 87 in Calabria, Italy. It provides primary treatment and discharges 17.22 m³/day of treated effluent.

Primary 87 Low

V_PAOLIERI

Impruneta, Toscana

V_PAOLIERI is a primary treatment plant in Impruneta, Tuscany, serving 62 people. It discharges 12.27 m³/day of wastewater into local water bodies.

Primary 62 Low

DEP_PERTETA

Villafranca in Lunigiana, Toscana

DEP_PERTETA is a primary treatment plant serving Villafranca in Lunigiana, Toscana, Italy. It discharges 545 m³/day of treated wastewater into the local watershed.

Primary 2,753 Low

DEP_BERTOLOTTI

Fornaci di Barga, Toscana

DEP_BERTOLOTTI is a primary wastewater treatment plant in Fornaci di Barga, Toscana, Italy, serving 153 people with a designed capacity of 80 m³/day and a discharge volume of 30.29 m³/day.

Primary 153 Low

PIP_LOPPORA

Fornaci di Barga, Toscana

PIP_LOPPORA is a primary treatment plant serving 61 people in Fornaci di Barga, Tuscany, Italy. It discharges 12.08 m³/day of treated wastewater into the local water system.

Primary 61 Low

PIP_CHITARRINO

Fornaci di Barga, Toscana

PIP_CHITARRINO is a primary treatment plant in Fornaci di Barga, Toscana, Italy, serving 183 people with a designed capacity of 100 m³/day and a discharge volume of 36.23 m³/day.

Primary 183 Low

IDL_ZONA_ARTIGIANA_CAPOLUOGO

Montespertoli, Toscana

IDL_ZONA_ARTIGIANA_CAPOLUOGO is a primary treatment plant in Montespertoli, Tuscany, Italy, serving 63 people with a designed capacity of 50 m³/day and a discharge volume of 12.47 m³/day.

Primary 63 Low

DEP_FORNACI_DI_BARGA

Fornaci di Barga, Toscana

DEP_FORNACI_DI_BARGA is a primary treatment plant serving Fornaci di Barga, Toscana, Italy. It treats wastewater for a population of 2,654 with a designed capacity of 1,000 m³/day.

Primary 2,654 Low

Frequently asked

How many wastewater treatment plants are in Italy?

UtilityRadar indexes 4089 wastewater treatment plants in Italy, with treatment level, capacity, operator and discharge data on each record.

What is the largest wastewater treatment plant in Italy?

Among the indexed plants, IMPIANTO_C_DA_ROCCHE has the highest designed capacity at 8,000 m3/day.

UtilityRadar
More
Press Esc to close · Browse by sector