1 plants indexed.
El Jobo wastewater treatment plant in Chiapas, Mexico, serves a population of 2,738 with secondary treatment. It has a designed capacity of 432 m³/day and discharges 259.20 m³/day.
UtilityRadar indexes 1 wastewater treatment plant in El Jobo, with treatment level, capacity, operator and discharge data on each record.
Among the indexed plants, El Jobo has the highest designed capacity at 432 m3/day.