1 plants indexed.
El Portento wastewater treatment plant serves 86 people in El Potento, Durango, Mexico. It provides secondary treatment with a designed capacity of 129.60 m³/day and discharges 101.09 m³/day.
UtilityRadar indexes 1 wastewater treatment plant in El Potento, with treatment level, capacity, operator and discharge data on each record.
Among the indexed plants, El Portento has the highest designed capacity at 130 m3/day.