1 plants indexed.
El Tunal wastewater treatment plant in El Pueblito, Durango, Mexico, serves 548 people with secondary treatment. It discharges 51.84 m³/day of treated effluent, operating at 78% of its designed capacity of 66.53 m³/day.
UtilityRadar indexes 1 wastewater treatment plant in El Pueblito, with treatment level, capacity, operator and discharge data on each record.
Among the indexed plants, El Tunal has the highest designed capacity at 67 m3/day.