3 plants indexed. Showing 2 matching current filters.
Centenario wastewater treatment plant in Gómez Palacio, Durango, Mexico, serves 6,389 people with secondary treatment. It discharges 604.80 m³/day and has a designed capacity of 864.00 m³/day.
Gomez Palacio Oriente wastewater treatment plant serves Gómez Palacio, Durango, Mexico. Designed capacity is 1.00 (units unspecified), serving a population of 91,273.
UtilityRadar indexes 3 wastewater treatment plants in Gómez Palacio, with treatment level, capacity, operator and discharge data on each record.
Among the indexed plants, Centenario has the highest designed capacity at 864 m3/day.