3 plants indexed. Showing 2 matching current filters.
Gomez Morin wastewater treatment plant serves Santa Catarina de Tepehuanes, Durango, Mexico, with secondary treatment for a population of 913. It discharges 86.40 cubic meters of treated wastewater daily.
Tepehuanes II El Molino is a secondary treatment plant serving Santa Catarina de Tepehuanes, Durango, Mexico. It treats wastewater for a population of 1,095 with a designed capacity of 1,555.20 cubic meters.
UtilityRadar indexes 3 wastewater treatment plants in Santa Catarina de Tepehuanes, with treatment level, capacity, operator and discharge data on each record.
Among the indexed plants, Tepehuanes II El Molino has the highest designed capacity at 1,555 m3/day.