4 plants indexed. Showing 2 matching current filters.
Campo Acosta secondary treatment plant serves 2,923 people in Tomatlán, Jalisco, Mexico. It discharges 432 m³/day of treated wastewater within 10 km of the Pacific coast.
Jose Maria Pino Suarez is a secondary wastewater treatment plant in Tomatlán, Jalisco, Mexico, serving approximately 3,597 people. It discharges 518.40 cubic meters of treated wastewater daily.
UtilityRadar indexes 4 wastewater treatment plants in Tomatlán, with treatment level, capacity, operator and discharge data on each record.
Among the plants on this page, the most-referenced operator is SIAPA Guadalajara. UtilityRadar's records show 2 plants linked to this operator.
Among the indexed plants, Campo Acosta has the highest designed capacity at 432 m3/day.