3 plants indexed. Showing 2 matching current filters.
Rio Viejo wastewater treatment plant in Centro, Tabasco, Mexico serves 9,127 people with primary treatment. It discharges 864 cubic meters of treated wastewater daily.
Huasteca 2da Seccion wastewater treatment plant in Centro, Tabasco, Mexico, serves a population of 5,067 with secondary treatment. It discharges 864 cubic meters per day and has a designed capacity of 1,296 cubic meters per day.
UtilityRadar indexes 3 wastewater treatment plants in Centro, with treatment level, capacity, operator and discharge data on each record.
Among the plants on this page, the most-referenced operator is CEAS Tabasco. UtilityRadar's records show 2 plants linked to this operator.
Among the indexed plants, Huasteca 2da Seccion has the highest designed capacity at 1,296 m3/day.