98 plants indexed. Showing 72 matching current filters.
Fraccionamiento Blancas Mariposas is a secondary treatment plant in Villahermosa, Tabasco, Mexico, serving about 5,933 people. It discharges 561.60 m³/day of treated wastewater, with a designed capacity of 864.00 m³/day.
Fraccionamiento 27 de Octubre is a secondary wastewater treatment plant in Villahermosa, Tabasco, Mexico, serving about 9,127 people. It discharges 864 m³/day of treated water into local water bodies.
Fraccionamiento Almendros is a secondary wastewater treatment plant in Villahermosa, Tabasco, Mexico, serving approximately 9,127 people with a designed capacity of 864 cubic meters per day.
Lomitas wastewater treatment plant in Tabasco, Mexico, serves 4,107 people with secondary treatment. It discharges 388.80 cubic meters daily and has a designed capacity of 864.00 cubic meters.
La Trinidad wastewater treatment plant in Cunduacán, Tabasco, Mexico, serves a population of 2,738 with secondary treatment. It discharges 259.20 cubic meters per day of treated wastewater.
El Tulipan wastewater treatment plant serves Carlos Rovirosa (Tulipán), Tabasco, Mexico. It provides secondary treatment for a population of 3,423 and discharges 324.00 cubic meters per day.
El Veinte wastewater treatment plant serves the community of Esperanza Norte (El 20) in Tenosique, Tabasco, Mexico. The secondary treatment facility has a designed capacity of 259.20 m³/day and currently treats 172.80 m³/day.
Mariano Abasolo wastewater treatment plant serves Teapa, Tabasco, Mexico. It provides secondary treatment for a population of 821, with a designed capacity of 86.40 m³/day and discharge volume of 77.76 m³/day.
Cuviac is a secondary wastewater treatment plant in Tacotalpa, Tabasco, Mexico, serving a population of 2,327. It has a designed capacity of 259.20 m³/day and discharges 220.32 m³/day.
Libertad wastewater treatment plant in Tabasco, Mexico, serves 2,327 people with secondary treatment. It discharges 220.32 cubic meters daily, operating at 85% of its 259.20 m³/day design capacity.
Francisco I Madero wastewater treatment plant serves 3,423 people in Paraíso, Tabasco, Mexico. It provides secondary treatment and discharges 324 m³/day, located within 10 km of the coast.
Moctezuma wastewater treatment plant in Paraíso, Tabasco, Mexico, serves 3,651 people with secondary treatment. It discharges 345.60 m³/day of treated wastewater near the coast.
Tucta wastewater treatment plant in Nacajuca, Tabasco, Mexico, serves a population of 3,879 with secondary treatment. It discharges 367.20 cubic meters of treated wastewater daily.
El Barrial wastewater treatment plant in Tabasco, Mexico, serves a population of 2,054 with secondary treatment. It discharges 194.40 volume units daily, operating at 75% of its designed capacity of 259.20 units.
Monte Grande wastewater treatment plant serves 2,181 people in Tabasco, Mexico, with secondary treatment. It discharges 324.00 units of treated wastewater daily, operating at 75% of its 432.00-unit design capacity.
Victor Fernandez Manero wastewater treatment plant serves Jalapa, Tabasco, Mexico. It provides secondary treatment for a population of 2,738 with a designed capacity of 259.20 volume units.
San Miguel Afuera is a secondary wastewater treatment plant in Jalapa, Tabasco, Mexico, serving approximately 3,651 people with a designed capacity of 432.00 volume units.
Tierra Nueva wastewater treatment plant serves the community of Tierra Nueva Tercera Sección in Tabasco, Mexico. It provides secondary treatment for a population of 2,054.
Mecatepec wastewater treatment plant in Tabasco, Mexico, serves 3,407 people with secondary treatment and a designed capacity of 604.80 m³/day.
R_A Pocvicuc is a secondary treatment plant serving 394 people in Pocvicuc, Tabasco, Mexico. It discharges 86.40 cubic meters of treated wastewater daily.
UtilityRadar indexes 98 wastewater treatment plants in Tabasco, with treatment level, capacity, operator and discharge data on each record.
Among the plants on this page, the most-referenced operator is CEAS Tabasco. UtilityRadar's records show 20 plants linked to this operator.
Among the indexed plants, Fraccionamiento 27 de Octubre has the highest designed capacity at 1,382 m3/day.