98 plants indexed. Showing 84 matching current filters.
Monte Grande wastewater treatment plant serves 2,181 people in Tabasco, Mexico, with secondary treatment. It discharges 324.00 units of treated wastewater daily, operating at 75% of its 432.00-unit design capacity.
Victor Fernandez Manero wastewater treatment plant serves Jalapa, Tabasco, Mexico. It provides secondary treatment for a population of 2,738 with a designed capacity of 259.20 volume units.
San Miguel Afuera is a secondary wastewater treatment plant in Jalapa, Tabasco, Mexico, serving approximately 3,651 people with a designed capacity of 432.00 volume units.
Tierra Nueva wastewater treatment plant serves the community of Tierra Nueva Tercera Sección in Tabasco, Mexico. It provides secondary treatment for a population of 2,054.
Mecatepec wastewater treatment plant in Tabasco, Mexico, serves 3,407 people with secondary treatment and a designed capacity of 604.80 m³/day.
R_A Pocvicuc is a secondary treatment plant serving 394 people in Pocvicuc, Tabasco, Mexico. It discharges 86.40 cubic meters of treated wastewater daily.
Ejido Jobal wastewater treatment plant serves the community of Chablé in Tabasco, Mexico. It provides secondary treatment for a population of 936 and has a designed capacity of 88.99 volume units.
Poblado Amado Gomez is a secondary wastewater treatment plant in Cunduacán, Tabasco, Mexico, serving about 2,191 people. It discharges 207.36 m³/day of treated effluent.
El Habanero wastewater treatment plant in Cárdenas, Tabasco, Mexico, serves a population of 2,054 with secondary treatment. It discharges 194.40 volume units daily and has a designed capacity of 864.00 volume units.
Colonia Agricola Santa Rosalia is a secondary treatment plant serving 4,107 people in Santa Rosalía, Tabasco, Mexico. It discharges 388.80 thousand cubic meters annually.
MactUn wastewater treatment plant serves the community of Mactún, Tabasco, Mexico. It provides secondary treatment with a designed capacity of 691.20 cubic meters per day.
Huasteca 2da Seccion wastewater treatment plant in Centro, Tabasco, Mexico, serves a population of 5,067 with secondary treatment. It discharges 864 cubic meters per day and has a designed capacity of 1,296 cubic meters per day.
Jolochero wastewater treatment plant serves 1,669 people in Benito Juárez, Balancán, Tabasco, Mexico. It provides secondary treatment with a designed capacity of 345.60 volume units.
El Naranjito wastewater treatment plant in Ejido El Naranjito, Tabasco, Mexico, serves a small population of 845 with secondary treatment. It discharges 345.60 cubic meters of treated wastewater daily.
Ojo de Agua wastewater treatment plant serves 803 people in Ejido Ojo de Agua, Tabasco, Mexico. It provides secondary treatment and discharges 172.80 cubic meters per day.
Poblado Guatacalca is a secondary wastewater treatment plant in Guatacalca, Tabasco, Mexico, serving approximately 4,107 people. It has a designed capacity of 864.00 m³/day and a discharge volume of 388.80 m³/day.
Ejido Pochitocal wastewater treatment plant in Tacotalpa, Tabasco, Mexico, serves a small population of 1,955 with secondary treatment. It discharges 207.36 m³/day, operating at 80% of its 259.20 m³/day design capacity.
Santa Cruz wastewater treatment plant in Tabasco, Mexico, serves 1,646 people with secondary treatment and a designed capacity of 432 m³/day.
Poblado Playa Larga wastewater treatment plant in Tabasco, Mexico provides secondary treatment for 1,475 residents. The facility has a designed capacity of 259.20 m³/day and discharges 207.36 m³/day of treated effluent.
Ejido Guanal 1ra Seccion is a secondary wastewater treatment plant in Jalapa, Tabasco, Mexico, serving 2,143 people. It discharges 367.20 m³/day of treated effluent into local water bodies.
UtilityRadar indexes 98 wastewater treatment plants in Tabasco, with treatment level, capacity, operator and discharge data on each record.
Among the plants on this page, the most-referenced operator is CEAS Tabasco. UtilityRadar's records show 20 plants linked to this operator.
Among the indexed plants, Huasteca 2da Seccion has the highest designed capacity at 1,296 m3/day.