98 plants indexed. Showing 2 matching current filters.
Rio Viejo wastewater treatment plant in Centro, Tabasco, Mexico serves 9,127 people with primary treatment. It discharges 864 cubic meters of treated wastewater daily.
Paseo Real de La Victoria is a primary-level wastewater treatment plant in Ocuiltzapotlán, Tabasco, Mexico, serving approximately 9,127 people with a discharge volume of 864 m³/day.
UtilityRadar indexes 98 wastewater treatment plants in Tabasco, with treatment level, capacity, operator and discharge data on each record.
Among the plants on this page, the most-referenced operator is CEAS Tabasco. UtilityRadar's records show 2 plants linked to this operator.
Among the indexed plants, RIo Viejo has the highest designed capacity at 864 m3/day.