7 plants indexed. Showing 6 matching current filters.
Cheel wastewater treatment plant in Córdoba, Veracruz, Mexico, provides secondary treatment for a population of 2,756. It discharges 260.93 cubic meters of treated wastewater daily.
El Cañaveral wastewater treatment plant in Córdoba, Veracruz, Mexico, serves approximately 5,093 people with secondary treatment. It discharges 482.11 cubic meters of treated wastewater daily.
Huilango 3000 is a secondary wastewater treatment plant in Córdoba, Veracruz, Mexico. It serves approximately 9,127 people with a designed capacity of 864 cubic meters per day.
Unidad Habitacional Cecadys is a secondary wastewater treatment plant in Córdoba, Veracruz, Mexico, serving 2,108 people. It discharges treated water into the local watershed, contributing to the region's water management.
Unidad Habitacional Cerezos is a secondary wastewater treatment plant in Córdoba, Veracruz, Mexico, serving 3,377 people with a discharge volume of 319.68 cubic meters.
Unidad Habitacional San Marcial is a secondary wastewater treatment plant in Córdoba, Veracruz, Mexico, serving 1,935 people with a designed capacity of 183.17 volume units.