5 plants indexed.
Unidad Habitacional Alejandro Mondragon is a secondary treatment plant in Poza Rica, Veracruz, Mexico, serving 274 people with a designed capacity of 30.24 m³/day.
Unidad Habitacional Ruben Leon Probert is a secondary wastewater treatment plant in Poza Rica, Veracruz, Mexico. It serves 274 people with a designed capacity of 30.24 m³/day and discharges 25.92 m³/day.
Unidad Habitacional Irina G Mondragon is a secondary wastewater treatment plant in Poza Rica, Veracruz, Mexico. It serves 274 people with a designed capacity of 30.24 m³/day and a discharge volume of 25.92 m³/day.
Unidad Habitacional Andres Togores is a secondary wastewater treatment plant in Poza Rica, Veracruz, Mexico, serving 274 people with a designed capacity of 30.24 m³/day and actual discharge of 25.92 m³/day.
Fraccionamiento Los Mangos is a secondary wastewater treatment plant in Poza Rica, Veracruz, Mexico. It serves a population of 3,651 and has a designed capacity of 864.00 m³/day.
UtilityRadar indexes 5 wastewater treatment plants in Poza Rica, with treatment level, capacity, operator and discharge data on each record.
Among the indexed plants, Fraccionamiento Los Mangos has the highest designed capacity at 864 m3/day.