2 plants indexed.
Zona Militar is a secondary wastewater treatment plant in Guadalupe, Zacatecas, Mexico, serving approximately 1,460 people. It has a designed capacity of 155.52 m³/day and discharges 138.24 m³/day.
El Salero wastewater treatment plant serves Guadalupe, Zacatecas, Mexico, treating wastewater from approximately 10,953 people. The plant discharges into local water bodies within the interior basin of central Mexico.
UtilityRadar indexes 2 wastewater treatment plants in Guadalupe, with treatment level, capacity, operator and discharge data on each record.
Among the plants on this page, the most-referenced operator is JIAPAZ Zacatecas. UtilityRadar's records show 2 plants linked to this operator.
Among the indexed plants, Zona Militar has the highest designed capacity at 156 m3/day.