Wastewater plants in Gelderland

51 plants indexed. Showing 7 matching current filters.

7 plants matching filters

UWWTP MAASBOMMEL

Maasbommel, Gelderland

UWWTP Maasbommel is an advanced wastewater treatment plant in Gelderland, Netherlands, serving about 2,293 people. It has a designed capacity of 5,004 m³/day and discharges treated effluent into the local water system.

Advanced 2,293 Low

UWWTP ECHTELD

Echteld, Gelderland

UWWTP Echteld is a closed advanced treatment plant in Echteld, Gelderland, Netherlands. It had a designed capacity of 540 cubic meters per day.

Advanced Low

UWWTP ELBURG

Elburg, Gelderland

UWWTP ELBURG is a municipal wastewater treatment plant in Elburg, Gelderland, Netherlands, serving approximately 66,367 people. It operates under the EU Urban Waste Water Treatment Directive.

Not Reported 66,367 Medium

UWWTP HARDERWIJK

Harderwijk, Gelderland

UWWTP Harderwijk serves approximately 152,750 people in Gelderland, Netherlands. The plant operates under the EU Urban Waste Water Treatment Directive, which mandates secondary treatment for agglomerations of this scale.

Not Reported 152,750 Medium

UWWTP HATTEM

Hattem, Gelderland

UWWTP HATTEM serves approximately 35,000 people in Hattem, Gelderland, Netherlands. The plant operates under the EU Urban Waste Water Treatment Directive, which mandates secondary treatment for agglomerations of this size.

Not Reported 35,283 Low

UWWTP NIJKERK

Nijkerk, Gelderland

UWWTP Nijkerk serves approximately 62,000 people in Gelderland, Netherlands. The plant operates under the EU Urban Waste Water Treatment Directive, which mandates secondary treatment for agglomerations of this scale.

Not Reported 62,183 Low

UWWTP VARIK

Varik, Gelderland

UWWTP VARIK is a closed advanced treatment plant in Varik, Gelderland, Netherlands. It had a designed capacity of 2250 m³/day and served the local community before decommissioning.

Advanced Low
UtilityRadar
More
Press Esc to close · Advanced search