3 plants indexed. Showing 2 matching current filters.
UWWTP Cruquius in Haarlem, Netherlands, is a closed advanced treatment plant with a designed capacity of 810 m³/day. It served the local area before decommissioning.
UWWTP Haarlem Schalkwijk serves approximately 51,617 people in Haarlem, Netherlands. The plant operates under the EU Urban Waste Water Treatment Directive, which mandates secondary treatment for agglomerations of this scale.
UtilityRadar indexes 3 wastewater treatment plants in Haarlem, with treatment level, capacity, operator and discharge data on each record.
Among the indexed plants, UWWTP CRUQUIUS has the highest designed capacity at 810 m3/day.