4 plants indexed.
UWWTP Boekelo in Enschede, Overijssel, Netherlands, is a closed advanced treatment plant. It served the local area with a designed capacity of 3,150 m³/day.
UWWTP Enschede Glanerbrug serves approximately 13,183 people in Enschede, Overijssel, Netherlands. The plant operates under the EU Urban Waste Water Treatment Directive, which mandates secondary treatment for agglomerations of this scale.
UWWTP Enschede West serves approximately 180,000 people in Enschede, Overijssel, Netherlands. The plant operates under the EU Urban Waste Water Treatment Directive, which mandates advanced treatment for large agglomerations in sensitive areas.
UWWTP Enschede Zuid is a closed advanced treatment plant in Enschede, Overijssel, Netherlands, with a designed capacity of 54,000 m³/day. It served the local population under the EU Urban Waste Water Treatment Directive.