Risk: Low Not Reported Not Reported treatment

Ried und Umgebung Wastewater Treatment Plant, Tumeltsham, Oberösterreich

Tumeltsham, Oberösterreich, Austria

Overview

Ried und Umgebung wastewater treatment plant serves 42,000 people in Tumeltsham, Oberösterreich, Austria. It operates under the EU Urban Waste Water Treatment Directive, ensuring compliance with secondary treatment standards for agglomerations of thi

Ried und Umgebung is a wastewater treatment plant located in Tumeltsham, a municipality in the Bezirk Ried district of Oberösterreich, Austria. The facility serves a population equivalent of 42,000, classifying it as a medium-sized agglomeration under Austrian and EU regulations. As a plant operating within the European Union, Ried und Umgebung is subject to the EU Urban Waste Water Treatment Directive (91/271/EEC). This directive requires secondary treatment for agglomerations between 10,000 and 150,000 population equivalent, with more stringent tertiary treatment in sensitive areas. The plant's design and operation align with these regulatory standards to protect water quality. The treated effluent from the plant is discharged into local watercourses that ultimately drain into the Danube River basin. The Danube is a major European river flowing into the Black Sea, supporting diverse aquatic ecosystems and providing water for agriculture, industry, and recreation. The plant plays a key role in maintaining the ecological health of this transboundary watershed.

Environmental context

The plant discharges into the Innviertel region's water network, which feeds into the Inn River and subsequently the Danube. The Danube River basin is one of Europe's most ecologically significant watersheds, supporting over 2,000 plant and animal species, including migratory fish like sturgeon. The plant's treatment helps reduce nutrient loads that could otherwise contribute to eutrophication in the Danube Delta and Black Sea.

Frequently asked questions

The plant is located in Tumeltsham, a municipality in the Bezirk Ried district of Oberösterreich, Austria. Its address is Ornetsmühl, Tumeltsham, 4911.

The plant serves a population equivalent of 42,000 people, making it a medium-sized agglomeration under EU classification.

The treated effluent is discharged into local watercourses that flow into the Inn River, a tributary of the Danube. The discharge is regulated under Austrian water law and EU directives.

As an Austrian plant, it operates under the EU Urban Waste Water Treatment Directive (91/271/EEC), which mandates secondary treatment for agglomerations of this size. Compliance is enforced by Austrian authorities.

For agglomerations of this scale, secondary treatment (biological treatment) is standard. In sensitive areas, tertiary treatment for nutrient removal may be required to protect receiving waters like the Danube.

Nearby plants

UtilityRadar
More
Press Esc to close · Advanced search