Risk: Low Not Reported Not Reported treatment

ETE S 1 Wastewater Treatment Plant, Sorocaba, São Paulo, Brazil

Sorocaba, São Paulo, Brazil

Overview

ETE S 1 is a wastewater treatment plant in Sorocaba, São Paulo, Brazil, serving approximately 237,000 people. It operates under Brazilian national regulations for large urban agglomerations.

ETE S 1 is a wastewater treatment plant located in Sorocaba, within the state of São Paulo, Brazil. The plant serves a population of around 237,000, classifying it as a large urban agglomeration under Brazilian wastewater management standards. Sorocaba is part of the Metropolitan Region of Sorocaba, an important industrial and economic hub in southeastern Brazil. As a large-scale facility, ETE S 1 is expected to meet the treatment standards set by Brazil's National Environment Council (CONAMA) and state-level environmental agencies. Brazilian regulations typically require secondary treatment for such agglomerations, with additional nutrient removal in sensitive watersheds. Its scale implies compliance with federal discharge standards. The plant's treated effluent likely discharges into the Sorocaba River, a tributary of the Tietê River, which flows through São Paulo state and ultimately into the Paraná River basin. The Sorocaba River supports local aquatic ecosystems and is used for water supply, recreation, and agriculture. Proper treatment is critical to prevent eutrophication and protect downstream water quality in the Tietê-Paraná system.

Environmental context

The plant's receiving water body is presumed to be the Sorocaba River, which flows into the Tietê River, a major watercourse in São Paulo state. The Tietê River drains into the Paraná River basin, eventually reaching the Río de la Plata estuary. The Sorocaba River watershed supports diverse aquatic life and is important for regional water supply. Downstream, the Tietê River passes through densely populated areas, making nutrient and pathogen removal essential to prevent algal blooms and protect public health.

Frequently asked questions

ETE S 1 is located in Sorocaba, in the state of São Paulo, Brazil. The plant is situated on Avenida 15 de Agosto in the Centro Empresarial Sorocaba (CESO) area, within the Metropolitan Region of Sorocaba.

ETE S 1 serves approximately 237,049 people, classifying it as a large urban agglomeration under Brazilian wastewater regulations.

The treated effluent from ETE S 1 is likely discharged into the Sorocaba River, which flows into the Tietê River and eventually reaches the Paraná River basin and the Río de la Plata estuary.

ETE S 1 operates under Brazil's National Environment Council (CONAMA) resolutions and state-level environmental permits from São Paulo's environmental agency (CETESB). Large agglomerations like this typically require secondary treatment and compliance with discharge standards for biochemical oxygen demand and suspended solids.

For a plant of this scale in Brazil, secondary treatment is standard, often using activated sludge or similar biological processes. In sensitive watersheds, tertiary treatment for nutrient removal may be required to prevent eutrophication in downstream water bodies.

Nearby plants

UtilityRadar
More
Press Esc to close · Advanced search