Overview
ETE WALITA is a secondary wastewater treatment plant in Varginha, Minas Gerais, Brazil, serving 814 people. It discharges 103.68 m³/day of treated effluent into local water bodies.
ETE WALITA is a municipal wastewater treatment plant located in the industrial district of Varginha, in the state of Minas Gerais, Brazil. The plant serves a small population of 814 people, reflecting its role in a localized community within the broader Varginha region. The plant provides secondary treatment, which is the standard biological treatment level required under Brazilian regulations (CONAMA resolutions) for most urban wastewater. Secondary treatment typically involves biological oxidation and sedimentation to reduce organic matter and suspended solids. The plant discharges 103.68 m³/day of treated effluent. The treated effluent from ETE WALITA is released into local water bodies that drain into the Rio Grande basin, a major tributary of the Paraná River system. This river network flows through southeastern Brazil and ultimately reaches the Río de la Plata estuary. The plant's operation helps protect downstream water quality in a region characterized by agricultural and industrial activity.
Environmental context
ETE WALITA discharges into local streams that feed the Rio Grande, a key river in the Paraná basin. The Rio Grande flows into the Paraná River, which empties into the Río de la Plata estuary. This watershed supports diverse aquatic life and is important for regional water supply and agriculture. The plant's secondary treatment reduces organic pollution, helping to maintain ecological balance in the downstream environment.
Frequently asked questions
ETE WALITA is located in the Distrito Industrial Cláudio Galvão Nogueira, Varginha, Minas Gerais, Brazil, near the BR-491 and MG-167 highways.
ETE WALITA serves a population of 814 people, making it a small-scale treatment facility for a localized community.
The plant discharges 103.68 m³/day of treated effluent into local water bodies that drain into the Rio Grande basin, part of the larger Paraná River system.
ETE WALITA provides secondary treatment, which is the standard biological treatment required under Brazilian regulations for most urban wastewater to reduce organic matter and suspended solids.
Brazil's CONAMA Resolution 430/2011 sets discharge standards for wastewater treatment plants. Secondary treatment is typically required for urban effluents, and plants like ETE WALITA must comply with limits on BOD, COD, and other parameters to protect receiving water bodies.
Nearby plants