Risk: Low Not Reported Primary treatment

Nustar Wastewater Treatment Plant, Općina Nuštar, Croatia

Općina Nuštar, Unknown, Croatia

Overview

Nustar wastewater treatment plant serves Općina Nuštar in Croatia, operating with primary treatment and a designed capacity of 5,000 m³/day. It is an inland facility contributing to local water management.

The Nustar wastewater treatment plant is located in Općina Nuštar, within the Vukovarsko-srijemska županija of eastern Croatia. This facility serves the local community as part of the region's municipal wastewater infrastructure. The plant provides primary treatment, which involves physical processes to remove settleable solids. With a designed capacity of 5,000 m³/day, it is sized for a smaller agglomeration. Under Croatian and EU regulations, plants serving smaller populations may be subject to less stringent treatment requirements, though primary treatment is a basic level that reduces organic load before discharge. The treated effluent from Nustar likely discharges into local waterways that drain into the Danube River basin, ultimately reaching the Black Sea. The facility plays a role in protecting local water quality and supporting the ecological health of the broader watershed.

Environmental context

The plant is situated inland in the Pannonian Basin, where local streams and canals feed into the Danube River system. The Danube flows eastward into the Black Sea, supporting diverse aquatic life and important migratory fish species. The region's agricultural landscape means that nutrient management from wastewater is crucial to prevent eutrophication in downstream water bodies.

Frequently asked questions

The Nustar wastewater treatment plant is located in Općina Nuštar, Vukovarsko-srijemska županija, eastern Croatia, near the D55 road.

The plant has a designed capacity of 5,000 m³ per day, indicating it serves a smaller community.

The treated effluent is discharged into local waterways that are part of the Danube River basin, eventually reaching the Black Sea.

The plant provides primary treatment, which involves physical sedimentation to remove solids. For smaller agglomerations in Croatia, this level may be compliant with EU Urban Waste Water Treatment Directive requirements.

Croatia, as an EU member state, implements the Urban Waste Water Treatment Directive (91/271/EEC). Plants serving smaller populations, like Nustar, are typically required to provide appropriate treatment based on the sensitivity of the receiving waters.

Nearby plants

UtilityRadar
More
Press Esc to close · Advanced search