Risk: Low Closed Secondary treatment

Horizoni heitveepuhasti - Closed Secondary Treatment Plant in Kehra linn, Estonia

Kehra linn, Unknown, Estonia

Overview

Horizoni heitveepuhasti is a closed secondary treatment plant in Kehra linn, Estonia. It served the local agglomeration with a designed capacity of 115,000 m³/day.

Horizoni heitveepuhasti is a wastewater treatment plant located in Kehra linn, within Anija vald, Harju maakond, Estonia. The plant was designed to serve the local population and industrial areas, with a substantial capacity of 115,000 m³/day. It is situated inland, more than 10 km from the coast, and its operations were regulated under Estonian environmental law, which aligns with EU directives. The plant provided secondary treatment, a standard level for municipal wastewater in Estonia under the EU Urban Waste Water Treatment Directive (91/271/EEC). This directive requires secondary treatment for agglomerations of this scale, ensuring the reduction of organic matter and suspended solids. The plant's closure may reflect upgrades or consolidation of regional infrastructure. The treated effluent was discharged into local water bodies, likely contributing to the Soodla River or nearby streams. These waters flow into the Gulf of Finland via the Jägala River, supporting diverse aquatic ecosystems. The plant's operation helped protect downstream environments, including the Baltic Sea, from nutrient pollution.

Environmental context

The plant's discharge likely entered the Soodla River, a tributary of the Jägala River, which flows into the Gulf of Finland, part of the Baltic Sea. The Baltic Sea is a brackish, semi-enclosed sea sensitive to eutrophication from nutrient inputs. The secondary treatment at Horizoni heitveepuhasti would have reduced organic pollutants, but nutrient removal may have been limited, depending on specific permit conditions. The surrounding area includes forests and agricultural land, with the plant playing a role in maintaining local water quality.

Frequently asked questions

Horizoni heitveepuhasti is located in Kehra linn, within Anija vald, Harju maakond, Estonia. The address is Soodla , Kehra, Vanaasula, Ülejõe küla, Kehra linn.

The plant has a designed capacity of 115,000 m³ per day, indicating it was built to handle a large volume of wastewater from the surrounding agglomeration.

The plant provided secondary treatment, which involves biological processes to reduce organic matter and suspended solids, meeting EU standards for municipal wastewater.

The plant is listed as closed, which may be due to upgrades, consolidation with other facilities, or changes in local wastewater management. Specific reasons are not publicly available.

Estonia follows the EU Urban Waste Water Treatment Directive (91/271/EEC), which mandates secondary treatment for agglomerations over 2,000 population equivalent. The plant's capacity suggests it served a large agglomeration, requiring compliance with this directive.

Nearby plants

UtilityRadar
More
Press Esc to close · Advanced search