Risk: Low Not Reported Advanced treatment

CHEVILLY Wastewater Treatment Plant, Chevilly, Centre-Val de Loire, France

Chevilly, Centre-Val de Loire, France

Overview

CHEVILLY wastewater treatment plant serves 3,000 people in Chevilly, Centre-Val de Loire, France. It provides advanced treatment and has a designed capacity of 3,000 m³/day.

The CHEVILLY wastewater treatment plant is located in Chevilly, a commune in the Loiret department of the Centre-Val de Loire region, France. The plant serves a population of approximately 3,000 residents and is part of the municipal wastewater infrastructure managed by local authorities. The plant provides advanced treatment, which goes beyond the secondary treatment required by the EU Urban Waste Water Treatment Directive (91/271/EEC) for agglomerations of this size. Advanced treatment typically includes nutrient removal (nitrogen and phosphorus) to protect sensitive receiving waters. The plant has a designed capacity of 3,000 m³/day and currently discharges a volume of 535.19 m³/day, indicating it operates well below its capacity. The treated effluent is discharged into the local watershed, which ultimately drains into the Loire River basin. The Loire is one of France's major rivers, flowing into the Atlantic Ocean. The advanced treatment helps protect the ecological quality of the Loire and its tributaries, supporting diverse aquatic life and maintaining water quality for downstream communities.

Environmental context

The plant discharges into the Loire River basin, which flows through central France before reaching the Atlantic Ocean. The Loire is a ecologically significant river, supporting diverse fish populations and migratory species. Advanced treatment at this plant helps reduce nutrient loading, protecting the river from eutrophication and preserving its ecological balance.

Frequently asked questions

The CHEVILLY plant is located on Route de Sougy in Chevilly, in the Loiret department of the Centre-Val de Loire region, France.

The plant serves approximately 3,000 people in the commune of Chevilly and surrounding areas.

The plant provides advanced treatment, which includes nutrient removal to protect the receiving water body.

Under the EU Urban Waste Water Treatment Directive (91/271/EEC), agglomerations with a population equivalent (PE) between 2,000 and 10,000 are required to have secondary treatment. The CHEVILLY plant exceeds this requirement by providing advanced treatment.

The plant has a designed capacity of 3,000 m³/day, and its current discharge volume is 535.19 m³/day, indicating it operates well below its capacity.

Nearby plants

UtilityRadar
More
Press Esc to close · Advanced search