Risk: Low Not Reported Advanced treatment

Gasny Nouvelle STEP - Advanced Wastewater Treatment in Gasny, Normandy

Gasny, Normandie, France

Overview

Gasny Nouvelle STEP is an advanced wastewater treatment plant in Gasny, Normandy, France, serving approximately 3,870 people with a design capacity of 6,000 m³/day.

Gasny Nouvelle STEP is a municipal wastewater treatment plant located in Gasny, a commune in the Eure department of Normandy, France. The plant serves a population of about 3,870 and has a design capacity of 6,000 m³/day, with an average daily discharge volume of 690.4 m³. The plant employs advanced treatment processes, which go beyond secondary treatment to remove nutrients and other pollutants. Under the EU Urban Waste Water Treatment Directive (91/271/EEC), plants serving agglomerations of this size are required to provide secondary treatment, but the advanced level here indicates compliance with more stringent standards for sensitive areas. The treated effluent is discharged into the local watershed, which ultimately drains into the Seine River basin and then into the English Channel. The plant's advanced treatment helps protect downstream water quality and supports the ecological health of the Seine estuary and coastal marine environment.

Environmental context

The plant discharges into the Seine River basin, which flows through Normandy and into the English Channel. The Seine estuary is an ecologically important area that supports diverse aquatic life, including migratory fish species. Advanced treatment at this plant reduces nutrient loading, helping to prevent eutrophication in the downstream marine environment.

Frequently asked questions

Gasny Nouvelle STEP is located on D 5 in Gasny, in the Eure department of Normandy, France.

The plant serves approximately 3,870 people in the Gasny area.

The plant provides advanced treatment, which includes nutrient removal beyond secondary treatment standards.

Under the EU UWWTD, agglomerations of this size (under 10,000 population equivalent) require appropriate treatment. The advanced level at Gasny Nouvelle STEP meets or exceeds the directive's requirements for sensitive areas.

The plant has a design capacity of 6,000 m³ per day, with an average daily discharge of 690.4 m³.

Nearby plants

UtilityRadar
More
Press Esc to close · Advanced search