Risk: Low Not Reported Secondary treatment

FAETO_1 Wastewater Treatment Plant, Faeto, Puglia, Italy

Faeto, Puglia, Italy

Overview

FAETO_1 is a secondary wastewater treatment plant in Faeto, Puglia, Italy, serving approximately 940 people with a designed capacity of 3,000 m³/day and a discharge volume of 328 m³/day.

FAETO_1 is a wastewater treatment plant located in Faeto, a small town in the province of Foggia, Puglia, Italy. The plant serves a population of about 940 residents and is part of the region's municipal wastewater infrastructure. As a secondary treatment facility, it provides biological treatment to reduce organic matter and suspended solids before discharge. The plant has a designed capacity of 3,000 cubic meters per day and currently discharges approximately 328 cubic meters per day, indicating it operates well below its capacity. Under the EU Urban Waste Water Treatment Directive (91/271/EEC), plants serving agglomerations of this size (under 2,000 population equivalent) are typically required to provide appropriate treatment, and secondary treatment meets this standard for inland areas. The treated effluent is discharged into local watercourses that drain into the Adriatic Sea via the Candelaro River and the Gulf of Manfredonia. The plant plays a key role in protecting the region's water quality, supporting both local ecosystems and downstream coastal environments.

Environmental context

FAETO_1 discharges into the Candelaro River basin, which flows into the Gulf of Manfredonia and ultimately the Adriatic Sea. The area supports diverse aquatic life and is part of a broader Mediterranean coastal ecosystem. The plant's secondary treatment helps reduce nutrient loads and organic pollution, safeguarding water quality in the river and downstream marine environment.

Frequently asked questions

FAETO_1 is located in Faeto, a small town in the province of Foggia, Puglia, Italy. The address is Via Marie Petit Pierre, Faeto, 71020.

The plant serves approximately 940 residents, making it a small-scale facility for the local community.

The treated effluent is discharged into local watercourses that flow into the Candelaro River, which drains into the Gulf of Manfredonia and the Adriatic Sea.

FAETO_1 provides secondary treatment, which includes biological processes to remove organic matter and suspended solids, meeting EU standards for small agglomerations.

As an Italian plant serving fewer than 2,000 people, it operates under the EU Urban Waste Water Treatment Directive (91/271/EEC), which requires appropriate treatment for inland discharges. Secondary treatment is standard for this scale.

Nearby plants

UtilityRadar
More
Press Esc to close · Advanced search