Risk: Low Not Reported Secondary treatment

GROTTOLE_PIETRA NEPITA Wastewater Treatment Plant, Grottole, Basilicata

Grottole, Basilicata, Italy

Overview

GROTTOLE_PIETRA_NEPITA is a secondary wastewater treatment plant serving 2,600 people in Grottole, Basilicata, Italy. It discharges 514.71 cubic meters of treated effluent daily.

GROTTOLE_PIETRA_NEPITA is a municipal wastewater treatment plant located in Grottole, a town in the Basilicata region of southern Italy. The plant serves a population of approximately 2,600 residents and operates under Italy's implementation of the EU Urban Waste Water Treatment Directive (91/271/EEC). The plant provides secondary treatment, which meets the minimum standard required by the EU directive for agglomerations of this size. Its designed capacity is 5,000 cubic meters per day, and it currently discharges an average of 514.71 cubic meters per day of treated wastewater. The treated effluent is discharged into local watercourses that eventually drain into the Ionian Sea. The plant plays a key role in protecting the water quality of the Basilicata region's rivers and coastal environment, supporting both ecological health and downstream uses.

Environmental context

The plant's discharge enters the local drainage network in the Basilicata region, which flows toward the Ionian Sea. This coastal area supports diverse marine life and is important for local fisheries and tourism. The secondary treatment provided helps reduce organic pollutants and suspended solids, protecting the receiving waters from eutrophication and maintaining ecological balance.

Frequently asked questions

The plant is located on Strada Provinciale Salandra Grottole, in the Rione Nitti area of Grottole, in the province of Matera, Basilicata, Italy.

The plant serves a population of approximately 2,600 residents in the town of Grottole and surrounding areas.

The plant provides secondary treatment, which includes biological processes to reduce organic matter and suspended solids before discharge.

Under the EU Urban Waste Water Treatment Directive (91/271/EEC), agglomerations with a population equivalent between 2,000 and 10,000 are required to provide secondary treatment. GROTTOLE_PIETRA NEPITA, serving 2,600 people, meets this requirement.

The plant discharges an average of 514.71 cubic meters of treated wastewater per day, well within its designed capacity of 5,000 cubic meters per day.

Nearby plants

UtilityRadar
More
Press Esc to close · Advanced search