Risk: Low Not Reported Secondary treatment

ORGIANO_PILASTRO Wastewater Treatment Plant, Cagnano, Veneto, Italy

Cagnano, Veneto, Italy

Overview

ORGIANO_PILASTRO is a secondary wastewater treatment plant in Cagnano, Veneto, Italy, serving 410 people with a designed capacity of 500 m³/day and a discharge volume of 81.17 m³/day.

ORGIANO_PILASTRO is a wastewater treatment facility located in the hamlet of Cagnano, within the municipality of Pojana Maggiore in the Veneto region of northern Italy. The plant serves a small population of 410 people, reflecting its role in a rural or small community setting. It is situated inland, away from coastal areas, and operates under the regulatory framework of the European Union and Italian national water quality standards. The plant provides secondary treatment, which is the minimum standard required under the EU Urban Waste Water Treatment Directive (91/271/EEC) for agglomerations of this size. Secondary treatment typically involves biological processes to reduce organic matter and suspended solids. The designed capacity of 500 m³/day indicates the plant's potential to handle higher loads, while the current discharge volume of 81.17 m³/day suggests it operates well below capacity. The treated effluent is discharged into local watercourses that eventually drain into the Po River basin, one of Italy's most significant hydrological systems. The Po River flows eastward into the Adriatic Sea, supporting diverse aquatic life and agricultural activities along its course. The plant's operation helps protect the local watershed from untreated sewage, contributing to the ecological health of the region's waterways.

Environmental context

The plant discharges into the Po River basin, which drains into the Adriatic Sea. This watershed supports a variety of aquatic species and is important for irrigation and drinking water supply in the Po Valley. The secondary treatment process reduces organic pollutants, helping to maintain water quality in downstream ecosystems, including the Po Delta, a region of high ecological value.

Frequently asked questions

The plant is located at Strada del Ponte Piero in Cagnano, a hamlet within the municipality of Pojana Maggiore, in the province of Vicenza, Veneto region, Italy.

The plant serves a population of 410 people, indicating a small-scale facility typical of rural communities in the Veneto region.

ORGIANO_PILASTRO provides secondary treatment, which involves biological processes to remove organic matter and suspended solids, meeting the EU Urban Waste Water Treatment Directive standards for small agglomerations.

Under the EU Urban Waste Water Treatment Directive (91/271/EEC), agglomerations with a population equivalent of less than 2,000 are required to provide appropriate treatment. ORGIANO_PILASTRO, serving 410 people, meets this requirement with secondary treatment.

The plant has a designed capacity of 500 m³ per day, with a current discharge volume of 81.17 m³ per day, indicating it operates well below its maximum capacity.

Nearby plants

UtilityRadar
More
Press Esc to close · Advanced search