Risk: Low Not Reported Secondary treatment

PRAGELATO Wastewater Treatment Plant, Pragelato, Piemonte, Italy

Pragelato, Piemonte, Italy

Overview

PRAGELATO wastewater treatment plant serves the town of Pragelato in Piemonte, Italy. It provides secondary treatment and has a designed capacity of 6,000 cubic meters per day.

The PRAGELATO wastewater treatment plant is located in the alpine town of Pragelato, in the Piemonte region of northwestern Italy. Serving a population of approximately 3,354 residents, the facility is part of the municipal wastewater infrastructure for this mountain community. The plant operates with secondary treatment, which is the standard biological treatment level required under the EU Urban Waste Water Treatment Directive (91/271/EEC) for agglomerations of this size. With a designed capacity of 6,000 cubic meters per day and an average discharge volume of 587 cubic meters per day, the plant has ample capacity to handle current loads. The treated effluent is discharged into local watercourses that drain into the Po River basin, ultimately reaching the Adriatic Sea. The plant plays a key role in protecting the sensitive alpine watershed and downstream ecosystems from untreated wastewater pollution.

Environmental context

The plant discharges into streams that feed the Po River, Italy's longest river, which flows eastward into the Adriatic Sea. The alpine watershed is ecologically sensitive, supporting diverse aquatic life and providing important habitat for species adapted to cold, oxygen-rich waters. The plant's secondary treatment helps reduce organic pollutants and protect water quality in this fragile mountain environment.

Frequently asked questions

The PRAGELATO plant is located in the town of Pragelato, in the province of Turin, Piemonte region, northwestern Italy. Its address is Via Nazionale, La Ruà, Pragelato.

The plant serves approximately 3,354 residents of Pragelato and surrounding areas.

The plant provides secondary treatment, which is the standard biological treatment required under EU regulations for agglomerations of this size.

Under the EU Urban Waste Water Treatment Directive (91/271/EEC), plants serving populations between 2,000 and 10,000 are required to provide secondary treatment. The PRAGELATO plant complies with this requirement.

The plant has a designed capacity of 6,000 cubic meters per day, with an average discharge volume of 587 cubic meters per day, indicating significant spare capacity.

Nearby plants

UtilityRadar
More
Press Esc to close · Advanced search