Risk: Low Not Reported Not Reported treatment

Hobscheid Wastewater Treatment Plant, Habscht, Luxembourg

Habscht, Unknown, Luxembourg

Overview

Hobscheid wastewater treatment plant serves the commune of Habscht in Luxembourg, treating wastewater for approximately 3,766 people. The plant operates under Luxembourg's implementation of the EU Urban Waste Water Treatment Directive.

Hobscheid wastewater treatment plant is located in the town of Hobscheid, part of the commune of Habscht in Canton Capellen, Luxembourg. The facility serves a population of around 3,766 residents, placing it in the small agglomeration category under EU regulations. Its location in western Luxembourg places it within the Alzette river basin, which ultimately drains to the Moselle River and the Rhine. Under the EU Urban Waste Water Treatment Directive (91/271/EEC), agglomerations with a population equivalent between 2,000 and 10,000 are required to have appropriate treatment systems. For Luxembourg, which has designated sensitive areas, such plants must meet secondary treatment standards or equivalent. The plant's treatment process and capacity details are not publicly available, but the regulatory framework ensures compliance with national water quality standards. The treated effluent from Hobscheid likely discharges into a local stream that feeds into the Alzette River, a tributary of the Moselle. The Moselle flows into the Rhine, which empties into the North Sea. This watershed supports diverse aquatic life and is important for regional biodiversity. The plant plays a key role in protecting downstream water quality in this transboundary river system.

Environmental context

The Hobscheid plant discharges into the Alzette River basin, which flows into the Moselle River and then the Rhine, ultimately reaching the North Sea. This watershed supports diverse aquatic ecosystems, including fish species such as salmon and trout, and is an important migratory corridor. The plant's treatment helps maintain water quality in this ecologically sensitive transboundary river system.

Frequently asked questions

The Hobscheid wastewater treatment plant is located on CR 105 in Hobscheid, part of the commune of Habscht in Canton Capellen, Luxembourg.

The plant serves approximately 3,766 people, classifying it as a small agglomeration under EU regulations.

The treated effluent likely discharges into a local stream within the Alzette River basin, which flows into the Moselle River and then the Rhine, ultimately reaching the North Sea.

As a Luxembourgish plant, it operates under the EU Urban Waste Water Treatment Directive (91/271/EEC), which requires appropriate treatment for agglomerations of its size, typically secondary treatment in sensitive areas.

For small agglomerations in Luxembourg, which has designated sensitive areas, the EU UWWTD mandates secondary treatment or equivalent to protect water quality in the Rhine basin.

Nearby plants

UtilityRadar
More
Press Esc to close · Advanced search