Risk: Low Not Reported Advanced treatment

Gosciejowice Male Wastewater Treatment Plant, Niemodlin, Opole Voivodeship, Poland

Niemodlin, województwo opolskie, Poland

Overview

Gosciejowice Male wastewater treatment plant in Niemodlin, Poland, serves about 4,936 people with advanced treatment. It discharges 703.80 m³/day and has a designed capacity of 12,070 m³/day.

Gosciejowice Male is a wastewater treatment plant located in the Niemodlin area of Opole Voivodeship, Poland. The facility serves a population of approximately 4,936, placing it in the small agglomeration category under Polish and EU regulations. The plant is situated inland, away from coastal zones, and treats municipal wastewater from the local community. The plant employs advanced treatment processes, which go beyond the secondary treatment standard required by the EU Urban Waste Water Treatment Directive (91/271/EEC) for agglomerations of this size. With a designed capacity of 12,070 m³/day and an actual discharge volume of 703.80 m³/day, the facility operates well below its capacity, indicating potential for future growth or seasonal variations. The plant's advanced treatment ensures high-quality effluent suitable for discharge into sensitive environments. The treated effluent is discharged into local watercourses that are part of the Odra River basin, which flows northward to the Baltic Sea. The Odra basin supports diverse aquatic ecosystems and is an important migratory corridor for fish. The advanced treatment helps protect downstream water quality in this ecologically significant region.

Environmental context

The plant discharges into the Odra River basin, which ultimately drains into the Baltic Sea. The Odra River and its tributaries support diverse aquatic life, including fish species that rely on clean water for spawning and migration. The advanced treatment at Gosciejowice Male helps reduce nutrient loads and pollutants, contributing to the ecological health of the downstream environment and the Baltic Sea, which is sensitive to eutrophication.

Frequently asked questions

The plant is located in the Niemodlin area, within Opole Voivodeship in southwestern Poland. Its address is 9, Boczna, Wesele, Niemodlin, gmina Niemodlin, powiat opolski, województwo opolskie.

The plant serves approximately 4,936 people, classifying it as a small agglomeration under EU wastewater treatment directives.

The plant provides advanced treatment, which includes nutrient removal beyond secondary treatment, ensuring high-quality effluent for discharge into sensitive water bodies.

Under the EU Urban Waste Water Treatment Directive (91/271/EEC), agglomerations of this size (under 10,000 population equivalent) require appropriate treatment. Poland has implemented this directive, and the plant's advanced treatment exceeds the minimum secondary treatment standard.

The plant discharges approximately 703.80 m³ of treated wastewater per day, well within its designed capacity of 12,070 m³/day.

Nearby plants

UtilityRadar
More
Press Esc to close · Advanced search