Risk: Low Not Reported Advanced treatment

Kepie zaleszanskie Wastewater Treatment Plant, Zaleszany, Poland

Zaleszany, województwo podkarpackie, Poland

Overview

Kepie zaleszanskie wastewater treatment plant in Zaleszany, Poland, serves 4,672 people with advanced treatment. It discharges 666.15 m³/day and has a designed capacity of 10,908 m³/day.

Kepie zaleszanskie is a wastewater treatment plant located in Zaleszany, within the podkarpackie province of Poland. It serves a population of 4,672, classifying it as a small to medium agglomeration under Polish and EU regulations. The plant is situated in a rural area near the San River basin, contributing to local water quality management. The plant employs advanced treatment processes, which go beyond the secondary treatment required by the EU Urban Waste Water Treatment Directive (91/271/EEC) for agglomerations of this size. With a designed capacity of 10,908 m³/day and an actual discharge volume of 666.15 m³/day, the facility operates well below its capacity, indicating potential for future growth or seasonal variability. The treated effluent is discharged into local watercourses that eventually drain into the San River, a tributary of the Vistula River, which flows into the Baltic Sea. The advanced treatment helps protect downstream ecosystems, including the Vistula delta and Baltic coastal waters, from nutrient pollution and other contaminants.

Environmental context

The plant discharges into the San River basin, which flows into the Vistula River and ultimately reaches the Baltic Sea. The Baltic Sea is a semi-enclosed sea sensitive to eutrophication from nutrient inputs. Advanced treatment at this plant reduces nitrogen and phosphorus loads, helping to mitigate algal blooms and oxygen depletion in downstream waters. The local watershed supports diverse aquatic life and is an important ecological corridor in southeastern Poland.

Frequently asked questions

Kepie zaleszanskie is located in Zaleszany, in the podkarpackie province of Poland. The address is 1, Spółdzielcza, Łączki, Zaleszany, gmina Zaleszany, powiat stalowolowolski, województwo podkarpackie, 37-415.

The plant serves a population of 4,672 people, classifying it as a small agglomeration under EU wastewater treatment directives.

The treated wastewater is discharged into local watercourses that flow into the San River basin, eventually reaching the Vistula River and the Baltic Sea.

The plant provides advanced treatment, which includes nutrient removal beyond the secondary treatment required by the EU Urban Waste Water Treatment Directive for agglomerations of this size.

As a Polish plant, it operates under the EU Urban Waste Water Treatment Directive (91/271/EEC) and Polish national regulations. Advanced treatment is typical for plants discharging into sensitive areas like the Baltic Sea catchment.

Nearby plants

UtilityRadar
More
Press Esc to close · Advanced search