Overview
Pilawa wastewater treatment plant serves the town of Pilawa in Mazowieckie, Poland, providing secondary treatment for a population of 2,591. It discharges 369.44 cubic meters of treated wastewater daily.
The Pilawa wastewater treatment plant is located in the town of Pilawa, within the Mazowieckie province of Poland. It serves a population of approximately 2,591 residents, making it a small-scale municipal facility. The plant is situated in an inland area, far from the coast, and operates under Polish regulations that transpose the EU Urban Waste Water Treatment Directive. The plant provides secondary treatment, which is the standard required by the EU Urban Waste Water Treatment Directive for agglomerations of this size. Secondary treatment typically involves biological processes to reduce organic matter and suspended solids. The plant has a designed capacity of 8,700 cubic meters per day, indicating it has room for future growth. The current discharge volume is 369.44 cubic meters per day, suggesting a utilization rate well below capacity. The treated effluent is discharged into local watercourses that eventually drain into the Vistula River basin, which flows northward into the Baltic Sea. The plant plays a key role in protecting the local watershed from pollution, supporting aquatic life and downstream water quality in the region.
Environmental context
The Pilawa plant discharges into the Vistula River basin, which is the largest river system in Poland and flows into the Baltic Sea. The local watershed supports diverse aquatic habitats and is important for migratory fish species. The plant's secondary treatment helps reduce nutrient loads that could otherwise contribute to eutrophication in the Baltic Sea, a sensitive marine environment.
Frequently asked questions
The Pilawa wastewater treatment plant is located in the town of Pilawa, in the Mazowieckie province of Poland, at coordinates 51.955 N, 21.514 E.
The plant serves a population of 2,591 residents in the town of Pilawa and surrounding areas.
The treated wastewater is discharged into local watercourses that are part of the Vistula River basin, which ultimately flows into the Baltic Sea.
The plant provides secondary treatment, which includes biological processes to remove organic matter and suspended solids, meeting the requirements of the EU Urban Waste Water Treatment Directive for small agglomerations.
As a Polish facility, the plant operates under national regulations that implement the EU Urban Waste Water Treatment Directive (91/271/EEC). For agglomerations under 10,000 population equivalent, secondary treatment is typically required, which the Pilawa plant provides.
Nearby plants