Risk: Low Not Reported Secondary treatment

Remoaes Wastewater Treatment Plant, Melgaço, Portugal

Melgaço, Unknown, Portugal

Overview

Remoaes wastewater treatment plant serves Melgaço, Portugal, treating wastewater for 3,300 people. It operates with secondary treatment and discharges 550.21 m³/day, with a designed capacity of 3,477 m³/day.

Remoaes wastewater treatment plant is located in Melgaço, in the Viana do Castelo district of northern Portugal. The facility serves a population of 3,300, classifying it as a small to medium agglomeration under Portuguese and EU regulations. The plant is situated inland, more than 10 km from the coast, and its operations are part of the regional wastewater infrastructure managed by local authorities. The plant provides secondary treatment, which is the standard required by the EU Urban Waste Water Treatment Directive (91/271/EEC) for agglomerations of this size discharging into freshwater. The designed capacity is 3,477 m³/day, and the current discharge volume is 550.21 m³/day, indicating operational headroom. As a secondary treatment facility, it removes organic matter and suspended solids, meeting the directive's minimum requirements for inland discharges. The treated effluent is discharged into a local watercourse that flows into the Minho River, which forms the border between Portugal and Spain. The Minho River eventually reaches the Atlantic Ocean near Caminha. The plant's operations help protect the Minho River basin, which supports diverse aquatic life and is an important ecological corridor in the region.

Environmental context

The plant discharges into a tributary of the Minho River, which flows into the Atlantic Ocean. The Minho River basin is ecologically sensitive, supporting diverse fish species and riparian habitats. Downstream, the estuary provides critical nursery grounds for marine life. The plant's secondary treatment helps reduce nutrient and organic loads, mitigating eutrophication risks in the river and coastal zone.

Frequently asked questions

Remoaes wastewater treatment plant is located in Melgaço, in the Viana do Castelo district of northern Portugal. The address is Portela, Gondomar e Corga, Prado e Remoães, Melgaço, 4960-207.

The plant serves a population of 3,300 people, classifying it as a small to medium agglomeration under EU classification.

The treated effluent is discharged into a local watercourse that flows into the Minho River, which eventually reaches the Atlantic Ocean. The plant provides secondary treatment to meet EU standards.

As a Portuguese plant, Remoaes operates under the EU Urban Waste Water Treatment Directive (91/271/EEC), which requires secondary treatment for agglomerations of this size discharging into freshwater.

For small to medium agglomerations in Portugal, secondary treatment is standard, as mandated by the EU Urban Waste Water Treatment Directive. This includes biological treatment to remove organic matter and suspended solids.

Nearby plants

UtilityRadar
More
Press Esc to close · Advanced search